Project Q2017750 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | COLLESANO PRIMARY CABIN PROJECT |
Project Q2017750 in Italy |
Statements
1,878,509.18 Euro
0 references
2,542,788.49 Euro
0 references
73.88 percent
0 references
26 March 2018
0 references
31 December 2020
0 references
E-DISTRIBUZIONE SPA
0 references
IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA E DELLE CABINE SECONDARIE SOTTESE. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. à PREVISTO ANCHE L'ACQUISTO DI UN NUOVO TRASFORMATORE AFFINCHé VENGA AMPLIATA LA CABINA PRIMARIA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITà SM (Italian)
0 references
THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL BE REPLACED WITH NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THIS WILL ALSO INCLUDE THE PURCHASE OF A NEW PROCESSOR, REFINING THE PROJECT, THE PROJECT QUALIFIES AS SMART GRIDS. IT PROVIDES FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FUNCTIONS WILL BE IMPLEMENTED: (English)