MESSINA HARBOUR Â OF THE TREMECRAFT LOGISTICS PLATFORM WITH PORT CALL ATTACHED (Q2017459): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 03:25, 2 November 2020

Project Q2017459 in Italy
Language Label Description Also known as
English
MESSINA HARBOUR Â OF THE TREMECRAFT LOGISTICS PLATFORM WITH PORT CALL ATTACHED
Project Q2017459 in Italy

    Statements

    0 references
    28,750,000.0 Euro
    0 references
    74,470,861.87 Euro
    0 references
    38.61 percent
    0 references
    3 October 2017
    0 references
    31 December 2021
    0 references
    AUTORITA' DI SISTEMA PORTUALE DELLO STRETTO
    0 references
    0 references

    38°11'37.54"N, 15°33'15.16"E
    0 references
    REALIZZAZIONE DI UNA PIASTRA INTERMODALE DOTATA DI VIABILITà DI ACCESSO DIRETTO DALLO SVINCOLO AUTOSTRADALE DI TREMESTIERI, DI UN PIAZZALE DI SOSTA PER IMBARCO DI MEZZI PESANTI E AUTOVETTURE (30.000 MQ) E DEL NUOVO SISTEMA PORTUALE IN AMPLIAMENTO ALL¿ESISTENTE DOTATO DI N.5 NUOVI ACCOSTI PER NAVI TRAGHETTO O N.4 PER NAVI RO-RO. IL PROGETTO PREVEDE COME OPERE DI MITIGAZIONE IL RIPASCIMENTO COSTIERO A NORD SIA LIBERO CHE PROTETTO (UTILIZZANDO I SEDIMENTI DRAGATI NELL¿AREA PORTUALE) E LA RINATURALIZZAZIONE CON REGIMENTAZIONE DEI TRE TORRENTI A MONTE. (Italian)
    0 references
    CONSTRUCTION OF AN INTERMODAL PLATE WITH VABILITY FOR DIRECT ACCESS FROM THE TREMEKLANDS MOTORWAY JUNCTION, A TRUCK PARKING YARD (30.000 M²) AND PASSENGER CARS (5 M²) AND THE NEW PORT SYSTEM IN EXTENSION TO THE EXISTING NEW PORT SYSTEM ACCOSTING FERRIES OR N.4 FOR RO-RO SHIPS. THE PROJECT INCLUDES AS MITIGATION WORKS THE COASTAL REPLENISHMENT IN THE NORTH, BOTH FREE AND PROTECTED (USING DREDGED SEDIMENTS IN THE PORT AREA) AND RESTORED RENATURALISATION IN THE THREE UPSTREAM STREAMS. (English)
    0 references

    Identifiers

    F41G08000000008
    0 references