Improving the energy efficiency of electricity and heat generation by modernising the cooling water pumps in Enea Połaniec S.A. (Q84441): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item: Label in wikidata changed) |
||
label / en | label / en | ||
Improving the energy efficiency of electricity and heat generation by modernising the cooling water pumps in Enea Połaniec S.A. |
Revision as of 07:48, 18 February 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of electricity and heat generation by modernising the cooling water pumps in Enea Połaniec S.A. |
Project in Poland financed by DG Regio |
Statements
3,150,000.0 zloty
0 references
5,202,654.0 zloty
0 references
75.0 percent
0 references
26 April 2018
0 references
31 December 2020
0 references
ENEA ELEKTROWNIA POŁANIEC SPÓŁKA AKCYJNA
0 references
Modernizacja swym zakresem obejmować będzie m.in. wymianę zespołów hydraulicznych pomp na zespoły o poprawionych parametrach technicznych, co wpłynie na zmniejszenie zużycia energii elektrycznej na potrzeby własne, a tym samym zmniejszenie zużycia energii pierwotnej i redukcję emisji CO2. Zakres prac obejmie: - wymianę zespołu hydraulicznego na zespół o parametrach technicznych (Qnom = 30 000 m3/h i Hnom = 14,5 mH2O), - modernizację układu hydraulicznego sterowania kątem łopat , - wymianę wszystkich wałów na nowe przystosowane do nowej konstrukcji pompy, - wymianę komory wirnikowej, - wymianę wykładzin górnej i dolnej, - wymianę kierownic (dolnej i górnej) pomp przystosowanych do nowej konstrukcji pompy, - wymianę zespołu łożyska oporowo-nośnego tzw. Michela, - wymianę wszystkich łożysk i tulei łożyskowych przystosowanych do nowej konstrukcji pompy, - wykonanie innych niezbędnych operacji koniecznych dla uzyskania zakładanego efektu ekologicznego. (Polish)
0 references
Identifiers
POIS.01.02.00-00-0010/18
0 references