The new construction of the station of an EIG Milzovice — ensuring the resilience of the centre of the Central Bohemia Region’s Fire Rescue Service with emphasis on adaptation to climate change and new risks (Q74381): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item: Label in wikidata changed) |
||
label / en | label / en | ||
The new construction of the station of an EIG Milzovice — ensuring the resilience of the centre of the Central Bohemia Region’s Fire Rescue Service with emphasis on adaptation to climate change and new risks |
Revision as of 00:30, 18 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The new construction of the station of an EIG Milzovice — ensuring the resilience of the centre of the Central Bohemia Region’s Fire Rescue Service with emphasis on adaptation to climate change and new risks |
Project in Czech Republic financed by DG Regio |
Statements
41,508,406.15 Czech koruna
0 references
48,833,419.0 Czech koruna
0 references
85 percent
0 references
10 December 2015
0 references
31 December 2019
0 references
Hasičský záchranný sbor Středočeského kraje
0 references
27201
0 references
Realizací projektu dojde k k posílení infrastruktury a připravenosti HZS Středočeského kraje na nová rizika v důsledku změn klimatu - riziko sucha. Výstupem projektu je nová zodolněná stanice typu P1 ve městě Milovice, ORP Lysá nad Labem. Cílem projektu je zajistit připravenost území ORP Lysá nad Labem a zajistit dostatečnou odolnost složek HZS Středočeského kraje vůči účinkům mimořádných událostí způsobených změnou klimatu. (Czech)
0 references
Identifiers
CZ.06.1.23/0.0/0.0/16_055/0002910
0 references