34005 EvolitY (Q190616): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 00:09, 30 October 2020
Project Q190616 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | 34005 EvolitY |
Project Q190616 in France |
Statements
2,906,512.05 Euro
0 references
7,266,280.12 Euro
0 references
40.0 percent
0 references
1 September 2015
0 references
31 August 2017
0 references
Communauté d'agglomération du pays de Montbéliard
0 references
Q2538023 (Deleted Item)
0 references
25200
0 references
Un projet de THNS (Transport à haut niveau de service) nommé évolitY est mis en place par PMA pour améliorer la mobilité de tous les habitants de l’agglomération par la restructuration de l’ensemble des transports publics, pour générer de nouvelles capacités d’intermodalités et réduire l’utilisation de la voiture individuelle notamment dans les déplacements domicile-travail. Il permet dans le même temps la restructuration urbaine du territoire : un certain nombre de lieux traversés font l’objet de requalification de l’espace public et d’amélioration des modes de déplacements doux (pistes cyclables, reconfiguration des trottoirs). Trois lieux stratégiques du projet sont présentés dans cette opération : la desserte du lycée A. Peugeot à Valentigney, le réaménagement urbain de l’axe Oehmichen à Valentigney et l’aménagement de deux parkings relais à Valentigney et Montbéliard. (French)
0 references
A project of THNS (High Level of Service Transport) named EvolitY is being set up by LDCs to improve the mobility of all inhabitants of the agglomeration through the restructuring of all public transport, to generate new intermodal capacity and to reduce the use of individual cars, particularly in commuting to work. At the same time, it allows the urban restructuring of the territory: a number of places crossed are subject to the reclassification of the public space and the improvement of modes of gentle travel (cyclable tracks, reconfiguration of sidewalks). Three strategic locations of the project are presented in this operation: service to the A. Peugeot high school in Valentigney, the urban redevelopment of the Oehmichen axis in Valentigney and the development of two relay car parks in Valentigney and Montbéliard. (English)
13 October 2020
0 references
0 references
Identifiers
10258
0 references
5117
0 references