Ensuring the stability of the slope of the RD point of Č.p. 280 of the Halenkovice. (Q58035): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item: Label in wikidata changed)
label / enlabel / en
 
Ensuring the stability of the slope of the RD point of Č.p. 280 of the Halenkovice.

Revision as of 22:32, 17 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Ensuring the stability of the slope of the RD point of Č.p. 280 of the Halenkovice.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,823,066.4 Czech koruna
    0 references
    72,922.656 Euro
    10 January 2020
    0 references
    2,144,784.0 Czech koruna
    0 references
    85,791.36 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 November 2017
    0 references
    2 April 2019
    0 references
    31 March 2019
    0 references
    Obec Halenkovice
    0 references
    0 references

    49°10'17.54"N, 17°27'58.57"E
    0 references
    76363
    0 references
    Nově budovaná opěrná stěna podporovaná pilotami bude zajišťovat vykloněný svah se stávající deovanou opěrnou stěnou.Celková délka stěny je 26 m.Úhlová zeď je vysoká 3,8 m,šířka je 2,15 m,dřík je široký O,4 m.Průměr pilot je 600 mm,délka pilot je 6,0 m apiloty budou vrtány v osové vzdálenosti cca 1,25 m.Celkový počet pilot je 28 ks. (Czech)
    0 references