Execution of photovoltaic micro-installations for the church building in Golenice, Myślibórz Municipality (Q137694): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 20:07, 29 October 2020
Project Q137694 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Execution of photovoltaic micro-installations for the church building in Golenice, Myślibórz Municipality |
Project Q137694 in Poland |
Statements
95,762.51 zloty
0 references
112,661.79 zloty
0 references
85.0 percent
0 references
30 May 2016
0 references
15 December 2017
0 references
PARAFIA RZYMSKOKATOLICKA PW. MB KRÓLOWEJ POLSKI W GOLENICACH
0 references
Przedmiotem projektu jest wykonanie mikroinstalacji fotowoltaicznych dla budynku Kościoła w Golenicach, Gmina Myślibórz. Kościół w Golenicach jest obiektem zabytkowym (nr. Rej. 1162 z dnia 12.12.1963 r.), dlatego też Parafia otrzymała opinię od Wojewódzkiego Konserwatora zabytków aby montaż instalacji odbywał się jako gruntowy a nie dachowy. W ostatnich latach kościół w Golenicach przeszedł głęboki remont, zgodnie z sugestiami Wojewódzkiego Konserwatora Zabytków. Przedmiotowa inwestycja stanowić będzie dopełnienie już zakończonych prac remontowych . Celem projektu jest zainstalowanie 3 fazowego systemu fotowoltaicznej o mocy 11,97 kW. Powierzchnia przed budynkiem Inwestora, pozwala na montaż instalacji złożonej z 42 modułów fotowoltaicznych, w układzie na 2 MPPT. System ten będzie współpracować z siecią zewnętrzną (system on-grid). Charakteryzuje się on tym, że niedobory energii będą uzupełniane z sieci, a nadwyżki produkcji sprzedawane. Planowane do wybudowania instalacje fotowoltaiczne stanowić będą zespół prądotwórczy, klasyfikowany jako mikroźródło (do 40 kW),wykorzystujące energię odnawialną. Instalacja wytwarzać będzie energię elektryczną na potrzeby własne stojącego nieopodal budynku kościoła. Występujący okresowo nadmiar energii, w przypadku braku chwilowego zapotrzebowania, zagospodarowany zostanie z postanowieniami Ustawy o OZE, w następujący sposób: 1)oddawany będzie do publicznej sieci elektroenergetycznej. Ilość energii oddanej do sieci elektroenergetycznej nie będzie przekraczać ilości energii pobranej i bilansowana będzie z ilością energii pobieranej z sieci w okresie 6 miesięcznym, 2)nie przewiduje się magazynowania energii w akumulatorach 3) nadmiar wyprodukowanej energii przewiduje się do odsprzedaży Przewiduje się budowę instalacji fotowoltaicznej o mocy ok. 11,97 kWp zlokalizowanej na zbudowanych wysięgnikach odgruntowych . Ilość wyprodukowanej z instalacji PV energii wyniesie 10,266 MWh/rok (Polish)
0 references
The subject of the project is the execution of photovoltaic micro-installations for the church building in Golenice, the Municipality of Myślibórz. The church in Golenice is a historic building (No. 1162 of 12.12.1963), which is why the parish received an opinion from the Provincial Monument Conservator to install the installation as ground rather than roof. In recent years the church in Golenice has undergone a deep renovation, as suggested by the Provincial Conservator of Historic Monuments. This investment will complement the renovation works already completed. The aim of the project is to install a 3 phase photovoltaic system with a power of 11.97 kW. The area in front of the Investor’s building allows the installation of an installation consisting of 42 photovoltaic modules, in arrangement for 2 MPPT. This system will work with the external network (on-grid). It is characterised by the fact that energy shortages will be replenished from the grid and surplus production will be sold. The planned photovoltaic installations will be a generating unit, classified as Micro-source (up to 40 kW), using renewable energy. The installation will generate electricity for its own needs near the church building. The periodic excess energy, in the absence of a temporary demand, will be managed with the provisions of the RES Act as follows: 1) will be transferred to the public electricity grid. The amount of energy delivered to the electricity grid will not exceed the amount of energy collected and will be balancing with the amount of energy consumed from the grid over a period of 6 months, 2) no energy storage in batteries is foreseen 3) excess energy produced is expected to be resale. 11.97 kWp located on built ground booms. The amount of energy produced from the PV installation will be 10,266 MWh/year (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A053/16
0 references