Energy modernisation of the House of Social Welfare in Resk (Q137608): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 20:01, 29 October 2020

Project Q137608 in Poland
Language Label Description Also known as
English
Energy modernisation of the House of Social Welfare in Resk
Project Q137608 in Poland

    Statements

    0 references
    3,698,334.88 zloty
    0 references
    887,600.37 Euro
    13 January 2020
    0 references
    4,350,982.22 zloty
    0 references
    1,044,235.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2014
    0 references
    30 September 2019
    0 references
    POWIAT ŁOBESKI
    0 references
    0 references
    Projekt zakłada wykonanie głębokiej, kompleksowej modernizacji energetycznej Domu Pomocy Społecznej w Resku. W wyniku przebudowy powstanie kondensacyjna kotłownia gazowa współpracująca z istniejącą instalacją kolektorów słonecznych oraz montaż kotła grzewczego na biomasę. W budynku głównym, budynku pralni i kotłowni instalacja centralnego ogrzewania oraz instalacja ciepłej wody użytkowej i cyrkulacji zostanie przebudowana. Przegrody zewnętrzne zostaną ocieplone, izolacja przeciwwilgociowa w budynkach zostanie wykonana. Strop poddasza nieogrzewanego w budynku głównym został ocieplony w 2014 roku. Stropodach wentylowany oraz połać dachowa w budynku pralni i kotłowni zostanie ocieplona. Wymienione zostaną wyeksploatowane drzwi oraz okna zewnętrze i fasada. Instalacja wentylacji mechanicznej pomieszczeń kuchni ze stołówką w budynku głównym, pomieszczeń pralni zostanie przebudowana. Zamontowane zostanie energooszczędne oświetlenie w budynku głównym, budynku pralni i kotłowni. Ponadto zamontowana zostanie instalacja paneli fotowoltaicznych na dachu łącznika. Zaproponowane rozwiązania pozwolą na najbardziej efektywne wykorzystanie energii cieplnej i elektrycznej dostarczanej do budynku. (Polish)
    0 references
    The project involves the implementation of a deep, comprehensive energy modernisation of the Social Assistance House in Resk. As a result of the reconstruction, a condensation gas boiler room will be created, cooperating with the existing installation of solar collectors and the installation of a heating boiler for biomass. In the main building, the central heating system and the installation of hot water and circulation will be reconstructed in the main building, the laundry and boiler room. The outer bulkheads will be warmed up, the damp insulation in the buildings will be made. The roof of the unheated loft in the main building was warmed up in 2014. Ventilated ceilings and roof panels in the laundry and boiler room building will be warmed up. The excavated doors and exterior windows and façade will be replaced. Installation of mechanical ventilation of kitchen rooms with canteen in the main building, laundry rooms will be rebuilt. Energy-efficient lighting will be installed in the main building, the laundry building and the boiler room. In addition, the installation of photovoltaic panels on the roof of the connector will be installed. The proposed solutions will allow for the most efficient use of heat and electricity supplied to the building. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.05.00-32-A022/16
    0 references