Thermal modernisation of public buildings (Q132326): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 19:28, 29 October 2020

Project Q132326 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings
Project Q132326 in Poland

    Statements

    0 references
    6,633,538.06 zloty
    0 references
    1,592,049.13 Euro
    13 January 2020
    0 references
    7,804,162.42 zloty
    0 references
    1,872,998.98 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2017
    0 references
    24 December 2018
    0 references
    GMINA KORSZE
    0 references
    0 references

    54°10'14.9"N, 21°8'39.1"E
    0 references
    Projekt dotyczy termomodernizacji budynków wraz z instalacją pompy ciepła oraz paneli fotowoltaicznych. Usprawnienie stanu technicznego 4 budynków: 1.Przedszkole Miejskie przy ul. Wolności 12 w Korszach działka nr 67, Zespół Szkół w Korszach przy ul. Kościuszki 12 w Korszach działka nr 79, Zespół Szkół w Garbnie 36 działka nr 27/38, Zespół Szkół w Łankiejmach 10 działka nr 112. Projekt zakłada ulepszenia w następującym zakresie: - docieplenie ścian, podłogi, stropu, dachu, posadzki - Wymiana okien i drzwi, - wymiana oświetlenia - instalacja wentylacji - montaż paneli fotow. w Garbnie, Łankiejmach i Korszach ul. Wolności 12 - wymiana grzejników - zamontowanie głowic termost. oraz zaworów równoważ. ciś. - izolacja rur - Montaż aparatury kontrol. Pom. - wymiana instalacji c.o - montaż pompy ciepła z maszynownią z dolnym źródłem w Garbnie - zamontowanie kotła elektr. -zamontowanie ciepłomierzy - zlikwidowanie murów z luksferów poprzez wstawienie okien - modernizacja kotłowni do zainstal. nowego kotła na olej Projekt spełnia warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Zgodnie z ustawą Prawo Budowlane Art.29 pozwolenie na budowę nie wymaga wykonywanie robót bud. polegających na dociepleniu budynków o wysokości do 25m. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła tylko i wyłącznie na potrzeby własne Gminy i będzie podłączona do sieci, jednak ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ust. o OZE (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wyprodukowana energia będzie służyła na potrzeby własne Gminy. Etapy realizacji: 1. Wybranie wykonawcy zgodnie z PzP 2. Podpisanie umowy z wykonawcą 3. Realizacji zadania, zgodnie z HRF. 4. Promocja (Polish)
    0 references
    The project concerns the thermal modernisation of buildings with the installation of heat pump and photovoltaic panels. Improvement of the technical condition of 4 buildings: 1. Urban preschool at ul. Freedom 12 in Korszy plot no. 67, School Complex in Korszy at ul. Kościuszki 12 in Korszy plot no. 79, School Complex in Garbno 36 plot No. 27/38, School Complex in Łankiejm 10 plot No. 112. The project aims to improve in the following areas: — warming of walls, floors, ceiling, roof, floors – Replacement of windows and doors, – replacement of lighting – ventilation installation – installation of photovoltaic panels in Garbno, Łankiejm and Korszy Street. Freedom 12 – exchange of radiators – installation of thermostat heads and balancing valves. — pipe insulation – Installation of control equipment. It’s a Pom. — replacement of central heating system – installation of heat pump with engine room with bottom source in Garbno – installation of an electric boiler. —installation of heat meters – removal of walls from luxpheres by inserting windows – modernisation of boiler room to install. new boiler for oil The project meets the shore conditions specified in SzOOP RPO WiM 2014-2020. According to the Law Construction Law Art.29 the construction permit does not require construction works consisting of insulation of buildings up to 25 m high. The installation according to the possibility described in the SzOOP will serve only for the own needs of the Municipality and will be connected to the network, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 paragraph of RES (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law will be carried out on the basis of the notification without the beneficiary having to have important technical conditions for connecting all energy generation sources included in the project to the electricity grid. The energy produced will serve for the local community’s own needs. Stages of implementation: 1. Selection of contractor in accordance with PZP 2. Signing of the contract with contractor 3. Implementation of the task, in accordance with HRF. 4. Promotion (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.01-28-0082/17
    0 references