Investments in renewable energy sources by the Municipality of Dubeninka (Q131906): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 18:56, 29 October 2020
Project Q131906 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Investments in renewable energy sources by the Municipality of Dubeninka |
Project Q131906 in Poland |
Statements
281,448.6 zloty
0 references
331,116.0 zloty
0 references
85.0 percent
0 references
1 January 2020
0 references
30 June 2020
0 references
GMINA DUBENINKI
0 references
Inwestycja polega na zakupie i montażu w Gminie Dubeninki systemu pomp ciepła w 5 lokalizacjach, łącznie 24 jednostek o łącznej mocy 139 kW: -OSP Dubieninki, działka nr 87 i dz nr 138/205, obręb Dubeninki: 11 jednostek o łącznej mocy 75,9 kW:3 jednostki o mocy 5,6 kW,1 jednostka o mocy 11,1 kW,4 jednostki o mocy 2,9 kW,2 jednostki o mocy 18,2 kW, 1 jedn. 3,2kW -Linowo, działka nr 33/4, obręb Linowo, 5 jednostek o łącznej mocy 18,1 kW:3 jednostki o mocy 2,9 kW,1 jednostka o mocy 3,8 kW,1 jednostka o mocy jednostkowej 5,6 kW -Żytkiejmy, działka nr 164/2, obręb Żytkiejmy: 5 jednostek o łącznej mocy 30,9 kW:3 jednostki o mocy 2,9 kW,2 jednostki o mocy 11,1 kW -OSP Pluszkiejmy OSP, działka nr 80, obręb Pluszkiejmy: 3 jednostki o łącznej mocy 14,1 kW:2 jednostki o mocy 5,6 kW,1 jednostka o mocy 2,9 kW Pompa ciepła działa na zasadzie transportu ciepła, umożliwia wykorzystanie ciepła o niskiej temp. do wytw. ciepła o wyższej temp.,które można zastosować do przygotowania ciepłej wody użytkowej. Pompa ciepła do swej pracy potrzebuje jedynie en. elektr., która jest przez nią wykorzyst. b. efektywnie. Eliminuje to konieczność podłączania do bud. objętego inwest. inst.gaz. czy innego źródła paliwa stałego czy ciekłego. W związku z tym, jest to inwest. ekolog., bezpieczna i oszczędna. Pompa ciepła planowana do inst. Nie wymaga wykonania odwiertów. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP oraz wpisuje się w założenia w SzOOP RPO WiM dla Osi Priorytetowej IV Efektywności energetycznej mające na celu zwiększeniu udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu. (Polish)
0 references
The investment consists of the purchase and installation of a heat pump system in 5 locations in the Dubeninka Municipality, a total of 24 units with a total capacity of 139 kW: —OSP Dubieninki, plot No 87 and No 138/205, Dubeninka region: 11 units with a total power of 75,9 kW:3 units with a power of 5,6 kW,1 units of 11,1 kW,4 units of 2,9 kW,2 units of 18.2 kW, 1 one kW -Linowo, plot No 33/4, the Linowo area, 5 units with a total power 18,1 kW:3 units with a power 2,9 kW,1 unit with a unit power no. 5 units with a total power of 30,9 kW:3 units with a power of 2,9 kW,2 units with a power of 11,1 kW -OSP Pluszkima OSP, cannon no. 80, the area of Pluszkima: 3 units with a total power of 14.1 kW:2 units with a capacity of 5.6 kW,1 units with a capacity of 2,9 kW The heat pump operates on the basis of heat transport, allows the use of low-temperature heat for higher temperature heat, which can be used to prepare hot water. The heat pump for its work only needs en. electr, which it uses effectively. This eliminates the need to connect to the buildings covered by the investment inst. gas or any other source of solid or liquid fuel. Therefore, it is an investment. ecologist., safe and economical. Heat pump planned for inst. Doesn't require drilling. The project will be completed within 1 from the signing of the grant agreement. The project meets all the shore conditions specified in the SzOOP and is part of the assumptions in the SzOOP RPO WiM for Priority Axis IV Energy Efficiency aimed at increasing the share of renewable energy sources in the overall energy balance of the region. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0288/18
0 references