Correction of the functioning of the communication system in the Rataje roundabout area (Q134936): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q134936 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q134936 w Polsce |
Revision as of 18:53, 29 October 2020
Project Q134936 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Correction of the functioning of the communication system in the Rataje roundabout area |
Project Q134936 in Poland |
Statements
106,611,085.01 zloty
0 references
125,424,805.91 zloty
0 references
85.0 percent
0 references
31 October 2017
0 references
30 September 2020
0 references
MIASTO POZNAŃ
0 references
Projekt obejmuje część infrastrukturalną polegającą na budowie zintegrowanego węzła przesiadkowego(ZWP) - 1 szt oraz zakup nowego taboru autobusowego- 15 szt Część infrastrukturalna to m. in. przebudowa infrastruktury torowo-sieciowej z jej dostosowaniem dla prowadzenia ruchu autobusowego po torowisku (łączna dł. nowych lub przebudowanych linii to ok. 1,605 km) i związana z tym korekta układu drogowego, w tym ścieżek dla rowerów (dł. wybudowanych i przebudowanych dróg rowerowych to ok. 2,892 km), parkingów typu Bamp;R(1 szt. na 25 stanowisk) oraz zainstalowanie ITS(1 szt) oraz wyznaczenie buspasów(0,372 km). Projekt zakłada również prace remontowo-budowlane na dworcu autobusowym Rataje(DA Rataje)w tym prace ukierunkowane na dostosowanie infrastruktury do potrzeb os. z niepełnosprawnościami. Przewidziane są działania informacyjno-promocyjne zachęcające do korzystania z niskoemisyjnych form mobilności miejskiej, w tym szczególności z transportu zbiorowego(3 szt). Integrację w ramach węzła zapewnią wspólne przystanki tramwajowo-autobusowe (TA), zaprojektowane z uwzględnieniem wytycznych dotyczących potrzeb osób z niepełnosprawności, dotyczy to również wybranych elementów nawierzchni drogowych. Poprawa warunków funkcjonowania układu komunikacyjnego zostanie osiągnięta m. in. poprzez: priorytet dla komunikacji publicznej, wprowadzenie efektywnego układu faz sterowania właściwego dla skrzyżowania z wyspą centralną, zwiększenie ilości pasów na wylotach, wprowadzenie najbardziej przyjaznej dla pieszych sygnalizacji świetlnej, rozdzielenie ruchu pieszego i rowerowego oraz system dynamicznej informacji pasażerskiej (13 tablic). Część taborowa to zakup autobusów o napędzie elektrycznym (o poj.ok. 110 os.na poj) wraz z ładowarkami planowany do osiągniecia wskaźnik - 1650os. Inwestycja przyczyni się do usprawnienia i rozwoju sys. transp. oraz stworzenia war. do sprawnego i bezpiecznego przemieszczania os. i towarów przy ograniczeniu szkodliwego wpływu na śr. nat. i warunki życ (Polish)
0 references
The project includes the infrastructure part consisting of the construction of an integrated interchange node (ZWP) – 1 pcs and the purchase of a new bus rolling stock – 15 units The infrastructure part includes reconstruction of track and network infrastructure with its adaptation for bus traffic on the track (the total length of new or reconstructed lines is approx. 1.605 km) and related correction of the road system, including paths for bicycles (long-built and reconstructed bicycle roads are approx. 2,892 km), parking lots of BAMP;R(1 units per 25 stations) and installation of ITS(1 pcs) and designation of buses (0.372 km). The project also includes renovation and construction works at the Rataje bus station (DA Rataje) including work aimed at adapting the infrastructure to the needs of people with disabilities. Information and publicity measures are envisaged to encourage the use of low-carbon forms of urban mobility, including in particular collective transport (3 pcs). Integration within the hub will be ensured by common tram and bus stops (TAs) designed to take into account guidelines for the needs of people with disabilities, including selected road surface elements. Improvements in the working conditions of the communication system will be achieved, inter alia, by: priority for public transport, the introduction of an effective control phase system suitable for the intersection with the central island, increasing the number of runways at the outlets, introducing the most pedestrian-friendly light signalling, separation of pedestrian and cycling traffic and dynamic passenger information system (13 plates). Part of Taborow is the purchase of electric buses (about. 110 people on the poj) together with the loaders planned to reach the indicator – 1650os. The investment will contribute to the improvement and development of sys. transp. and the creation of war. for the smooth and safe movement of people and goods, while limiting the harmful effects on weds and conditions of life (English)
21 October 2020
0 references
Identifiers
RPWP.03.03.03-30-0010/17
0 references