Preparation of infrastructure to locate and conduct business in degraded and post-industrial areas in Piekary Śląskie (Q122885): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 17:27, 29 October 2020
Project Q122885 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Preparation of infrastructure to locate and conduct business in degraded and post-industrial areas in Piekary Śląskie |
Project Q122885 in Poland |
Statements
2,267,182.49 zloty
0 references
2,667,273.52 zloty
0 references
85.0 percent
0 references
25 May 2017
0 references
30 May 2018
0 references
GMINA PIEKARY ŚLĄSKIE
0 references
Projekt polega na kompleksowym przygotowaniu terenów inwestycyjnych typu brownfield w rejonie ul. Podmiejskiej, DW 911 i ul. Pod Lipami w Piekarach Śląskich, w celu nadania im nowych funkcji gospodarczych wraz z możliwością ich promocji. Przedmiotem projektu jest odwodnienie poprzez budowę sieci kanalizacji deszczowej i budowa drogi, w efekcie czego uzbrojonych zostanie 13,38 ha terenów inwestycyjnych. Elementem projektu jest również promocja inwestycyjna uzbrojonego obszaru. Projekt realizowany będzie w okresie od dnia 25.05.2017 r. do dnia 30.05.2018 r. (Polish)
0 references
The project consists of a comprehensive preparation of brownfield investment areas in the area of ul. Suburban, DW 911 and ul. Under Lipa in Piekary Śląskie, in order to give them new economic functions, together with the possibility of promoting them. The object of the project is dehydration through the construction of a rainwater sewerage network and the construction of a road, as a result of which 13.38 ha of investment areas will be armed. Investment promotion of the armed area is also an element of the project. The project will be implemented in the period from 25.05.2017 to 30.05.2018. (English)
21 October 2020
0 references
Identifiers
RPSL.03.01.01-24-01F3/16
0 references