Reduce low emissions by modernising street lighting networks as a result of the use of energy-efficient LED solutions (Q124112): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 17:19, 29 October 2020
Project Q124112 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduce low emissions by modernising street lighting networks as a result of the use of energy-efficient LED solutions |
Project Q124112 in Poland |
Statements
1,250,599.92 zloty
0 references
1,580,836.71 zloty
0 references
79.11 percent
0 references
7 December 2015
0 references
30 September 2018
0 references
MIASTO MYSŁOWICE
0 references
Przedmiotem realizacji projektu jest wymiana oświetlenia będącego własnością Miasta na efektywne energetycznie oświetlenie typu LED. Projekt realizowany jest w 13 odrębnych obszarach, na które składają się ważniejsze ciągi komunikacyjne i piesze, centrum Miasta oraz parki. W wyniku realizacji projektu zmniejszeniu ulegną koszty energii elektrycznej a także zmniejszy się emisja zanieczyszczeń do atmosfery (CO2, PM10). Dodatkowo projekt ma również wpływ na poprawę jakości i bezpieczeństwa transportu miejskiego. Rzeczowa realizacja projektu została zaplanowana na okres 06.2018-09.2018. (Polish)
0 references
The aim of the project is to replace lighting owned by the City with energy-efficient LED lighting. The project is implemented in 13 separate areas, consisting of major transport and pedestrian routes, the city centre and parks. As a result of the project, electricity costs will be reduced as well as emissions of pollutants into the atmosphere (CO2, PM10) will be reduced. In addition, the project also has an impact on improving the quality and safety of urban transport. The actual implementation of the project was planned for the period 06.2018-09.2018. (English)
21 October 2020
0 references
Identifiers
RPSL.04.05.01-24-040A/16
0 references