Construction of renewable energy lighting in the municipality of Suszec (Q123695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 16:41, 29 October 2020

Project Q123695 in Poland
Language Label Description Also known as
English
Construction of renewable energy lighting in the municipality of Suszec
Project Q123695 in Poland

    Statements

    0 references
    0 references
    1,361,955.0 zloty
    0 references
    326,869.2 Euro
    13 January 2020
    0 references
    1,602,300.0 zloty
    0 references
    384,552.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 October 2017
    0 references
    30 November 2018
    0 references
    GMINA SUSZEC
    0 references
    0 references

    50°2'16.8"N, 18°47'17.9"E
    0 references
    Przedmiotem projektu jest budowa oświetlenia ulicznego hybrydowego o mocy do 40kW na terenie Gminy Suszec w ilości 101 szt. Każda lampa będzie zasilana modułem fotowoltaicznym i turbiną wiatrową. Lampy będą zainstalowane na stalowych słupach o wysokości 9,5 mb, posadowione na prefabrykowanej stopie fundamentowej. (Polish)
    0 references
    The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-02B2/16
    0 references