Deep energy modernisation of the Janusz Korczak Economic School Complex in Dębica (Q118721): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 16:16, 29 October 2020
Project Q118721 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Deep energy modernisation of the Janusz Korczak Economic School Complex in Dębica |
Project Q118721 in Poland |
Statements
1,200,813.56 zloty
0 references
1,412,721.86 zloty
0 references
85.0 percent
0 references
30 March 2016
0 references
29 December 2017
0 references
POWIAT DĘBICKI
0 references
Celem realizacji projektu jest głęboka modernizacja energetyczna obiektu użyteczności publicznej, tj. budynku Zespołu Szkół Ekonomicznych im. Janusza Korczaka w Dębicy.Działania projektowe służą poprawie efektywności energetycznej poprzez zwiększenie izolacyjności cieplnej przegród zewnętrznych budynku oraz dostosowanie konstrukcji do projektowanych zmian w zakresie instalacji wewnętrznych. Przyczyni się to do zmniejszenia kosztów eksploatacji obiektu i wzrostu komfortu użytkowania.Celem strategicznym przedsięwzięcia jest ochrona środowiska naturalnego poprzez redukcję emisji zanieczyszczeń oraz obniżenie zapotrzebowania na energię elektryczną w połączeniu z podniesieniem parametrów energetycznych modernizowanego budynku.W zakres rzeczowy inwestycji wchodzi: ocieplenie ścian zewnętrznych, stropu – skosy oraz stropu żelbetowego i drewnianego; wymiana okien (11,43 m2); wymiana drzwi (9,47 m2); zmiana wentylacji w części pomieszczeń z grawitacyjnej na mechaniczną z odzyskiem ciepła; modernizacja CWU (wykonanie instalacji CWU i zasilenie jej z pompy ciepła typu powietrze/woda sprężarkowa napędzana elektrycznie); modernizacja instalacji c.o.; usprawnienie systemu grzewczego (kompleksowa wymiana przewodów instalacji c.o.- 1154 m; montaż: zaworów i głowic termostatycznych-127 szt., nowych grzejników- 127 szt., gazowego kotła kondensacyjnego wraz z osprzętem- 1 kpl., liczników ciepła- 17 szt., naczynia wzbiorczego – 1 szt oraz regulacja hydrauliczna instalacji- 1 kpl.)Ponadto: wymiana pokrycia dachowego wraz z innymi elementami połaci dachowej, wykonanie obudowy i sufitów podwieszanych oraz modernizacja instalacji elektrycznej.Inwestycja służy dostosowaniu obiektu do warunków technicznych w zakresie izolacyjności cieplnej do standardów obowiązujących po 1 stycznia 2021 r. Realizacja projektu umożliwi:- zmniejszenie zapotrzebowania na zużycie energii o 60,77%,- osiągnięcie wskaźnika EP na poziomie 156,99 [kWh/(m2- rok)]. (Polish)
0 references
The aim of the project is to deepen the energy modernisation of the public utility facility, i.e. the Janusz Korczak Economic School Complex in Dębica.Project activities aim to improve energy efficiency by increasing the thermal insulation of the outer partitions of the building and adapting the structure to the design changes in the scope of internal installations. This will reduce the costs of operating the facility and increase comfort of use.The strategic objective of the project is to protect the environment by reducing emissions of pollutants and reducing the demand for electricity combined with increasing the energy parameters of the modernised building.The material scope of the investment includes: warming of outer walls, ceilings – slants and reinforced concrete and wooden ceilings; window replacement (11.43 m²); replacement of doors (9.47 m²); change of ventilation in the part of spaces from gravity to mechanical heat recovery; upgrading of the CWU (construction of the CWU installation and powering it from a heat pump type of air/compressor water powered by electricity); modernisation of central heating installations; improvement of the heating system (comprehensive replacement of the central heating system – 1154 m); assembly: thermostatic valves and heads – 127 pcs, new radiators- 127 pcs, gas condensation boiler with accessories – 1 kpl., heat meters- 17 pcs, collapsing vessels – 1 pcs and hydraulic adjustment of the installation – 1 kpl.) replacement of roof covering together with other elements of roofing, construction of housing and suspended ceilings and modernisation of electrical installations.The investment is designed to adapt the facility to technical conditions in the field of thermal insulation to the standards applicable after 1 January 2021. The project will enable:- reduction of energy consumption by 60.77 %,- reaching an EP index of 156.99 [kWh/(m²-year)]. (English)
20 October 2020
0 references
Identifiers
RPPK.03.02.00-18-0095/16
0 references