Extension of ul. Myślenicka in Kraków (Q112993): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Changed label, description and/or aliases in 1 language: Changing unique label-description pair) |
||
label / en | label / en | ||
Extension of ul. Myślenicka in | Extension of ul. Myślenicka in Kraków |
Revision as of 15:00, 29 October 2020
Project Q112993 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of ul. Myślenicka in Kraków |
Project Q112993 in Poland |
Statements
14,523,424.59 zloty
0 references
19,364,565.23 zloty
0 references
75.0 percent
0 references
1 December 2015
0 references
31 December 2019
0 references
GMINA MIEJSKA KRAKÓW
0 references
Projekt obejmuje rozbudowę ul. Myślenickiej na odcinku o długości ok. 2,375 km od na odcinku od ronda przy zjeździe z autostrady A-4 do skrzyżowania z ulicami Niewodniczańskiego i Krzyżańskiego wraz z infrastrukturą towarzyszącą, jak również promocję projektu. Szczegółowy zakres robót budowlanych przewidzianych do realizacji obejmuje: - rozbudowę, budowę i przebudowe jezdni i chodników wraz z przebudową skrzyżowań ul. Myślenickiej z ulicami: Warszewicza, Morozewicza, Merkuriusza Polskiego, Siarczanogórską, Siarczki, Szybisko, Sawiczewskich, Niewodniczańskiego - budowę murów oporowych na odcinkach: od km 0+392,50 do km 0+447,90 oraz od km 0+822,80 do km 0+882,50; - przebudowę i budowę zjazdów do posesji na całej długości wnioskowanego odcinka; - przebudowę i budowę kanalizacji deszczowej ze studniami rewizyjnymi oraz wylotami do odbiorników oraz wpustami deszczowymi i przyłączami na odcinku od km 0-296,00 do km 2+069,50; - przebudowę istniejących przepustów drogowych w miejscach: w km 1+300,30, w km 1+836,00 oraz na odcinku od km 1+990,50 do km 2+007,40; - przebudowę rowów na odcinkach: od km 1+977,90 do km 1+990,50 oraz od 2+007,40 do km 2+021,30; - przebudowę i budowę sieci oświetlenia ulicznego na odcinku od km 0+023,30 do km 2+070,45; - przebudowę sygnalizacji świetlnej wraz z budową pętli indukcyjnych i przewodów zasilających na odcinku od km 0+464,30 do km 564,30; - przebudowę kolidującej sieci elektroenergetycznej wraz z przyłączami oraz likwidacją nieczynnych odcinków sieci na odcinkach: od km 0-033,75 do km 0+907,25, od km 0+922,70 do km 0+923,95, od km 1+180,10 do km 1+361,80, od km 1+717,90 do km 1+729,20, od km 1+925,10 do km 1+996,95, od km 2+024,80 do km 2+070,35; - przebudowę kolidującej sieci teletechnicznej wraz z przyłączami na odcinkach: od km 0-254,05 do km 0-141,80, od km 0-034,35 do km 0+621,20, od km 0+755,85 do km 1+978,60, od km 2+024,10 do km 2+094,30; - przebudowę kolidującej sieci wodociągowej wraz z przyłączami oraz likwidacją nieczyn (Polish)
0 references
The project includes the extension of ul. It has a length of approx. 2.375 km from the roundabout at the exit of the A-4 motorway to the intersection with Niewodniczański and Krzyżański streets along with accompanying infrastructure, as well as the promotion of the project. The detailed scope of the construction works to be carried out includes: — extension, construction and reconstruction of roads and sidewalks along with the reconstruction of intersections ul. Myślenicka with streets: Warsaw, Morozewicz, Merkuriusz Polski, Siarczanogórska, Siarczki, Szybisko, Sawiczewskich, Niewodniczański – construction of resistance walls on sections: from km 0 + 392.50 to km 0 + 447.90 and from km 0 + 822.80 to km 0 + 882.50; — reconstruction and construction of exits to the property over the entire length of the requested section; — reconstruction and construction of rain drainage with inspection wells and outlets for receivers, rain drains and connections in the section from km 0-296.00 to km 2 + 069,50; — reconstruction of existing road culverts in the following locations: in km 1 + 300.30, in km 1 + 836.00 and in the section from km 1 + 990.50 to km 2 + 007.40; — reconstruction of ditches on sections: from km 1 + 977.90 to km 1 + 990.50 and from 2 + 007.40 to km 2 + 021.30; — reconstruction and construction of a street lighting network in the section from km 0 + 023.30 to km 2 + 070,45; — reconstruction of light signalling with the construction of induction loops and power supply cables in the section from km 0 + 464.30 to km 564.30; — reconstruction of the interfering electricity grid with connections and the removal of inactive sections of the network on sections: from km 0-033.75 to km 0 + 907.25, from km 0 + 922.70 to km 0 + 923.95, from km 1 + 180.10 to km 1+ 361.80, from km 1 + 717.90 to km 1+729.20, from km 1+925,10 to km 1+ 1,996, from km 996 + 996,996 km to km ⁇ + ⁇, ⁇; — reconstruction of the interfering telecommunication network with connections on sections: from km 0-254.05 to km 0-141.80, from km 0-034.35 to km 0 + 621.20, from km 0 + 755.85 to km 1+ 978.60, from km 2 + 024.10 to km 2+094.30; — reconstruction of the interfering water supply network with connections and liquidation of failures (English)
20 October 2020
0 references
Identifiers
RPMP.07.01.02-12-0041/16
0 references