Extension of the communication line on the north-south axis – Voivodeship road No. 454. It’s stage 2. Extension of Voivodeship Road No. 454 in Krzywa Góra with reconstruction of the bridge facility. (Q115079): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:39, 29 October 2020
Project Q115079 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the communication line on the north-south axis – Voivodeship road No. 454. It’s stage 2. Extension of Voivodeship Road No. 454 in Krzywa Góra with reconstruction of the bridge facility. |
Project Q115079 in Poland |
Statements
7,330,716.72 zloty
0 references
8,624,372.62 zloty
0 references
85.0 percent
0 references
15 December 2016
0 references
31 December 2017
0 references
WOJEWÓDZTWO OPOLSKIE
0 references
Przedmiotem inwestycji jest rozbudowa drogi wojewódzkiej nr 454 wraz z przebudową obiektu mostowego w m. Krzywa Góra na odc. od km 23+300 – 25+100. Istniejący most ujęty jest w wojewódzkiej ewidencji zabytków, budowa nowego obiektu jest wiernym odwzorowaniem formy architektonicznej. Zakres zadania obejmuje rozbiórkę mostu i budowę w jego miejscu nowej konstrukcji żelbetowej, z ustrojem nośnym w formie łuku bezprzegubowego o rozpiętości 17,5 m i szerokości całkowitej 18,5 m. Na moście zaprojektowano jezdnię o szerokości 2x3,5m, dwie opaski bezpieczeństwa oraz chodnik jednostronny o szerokości 1,95m. Most został zaprojektowany na obciążenie klasą A ( 50 T). Na czas trwania rozbudowy drogi zaprojektowano drogę objazdową o długości 157,0 m z mostem tymczasowym składanym. Dla przeprowadzenia wód z rowów przydrożnych oraz rowu melioracyjnego zaprojektowano 4 przepusty. Budowę nawierzchni drogi wojewódzkiej na długości ok. 1,8 km, przebudowę skrzyżowań z istniejąca siecią drogową, przebudowę i budowę zjazdów publicznych i indywidualnych. Przebudowę sieci telekomunikacyjnej i elektroenergetycznej, budowę elementów bezpieczeństwa ruchu. (Polish)
0 references
The subject of the investment is the extension of the Voivodeship Road No. 454 together with the reconstruction of the bridge facility in the Krzywa Góra m. from km 23 + 300-25+ 100. The existing bridge is included in the voivodeship historical records, the construction of a new building is a faithful representation of the architectural form. The scope of the task includes the demolition of the bridge and the construction of a new reinforced concrete structure in its place, with a support system in the form of an uninterrupted arch with a span of 17.5 m and a total width of 18.5 m. On the bridge a road with a width of 2x3.5m, two safety bands and a one-sided pavement with a width of 1.95 m were designed. The bridge was designed to load class A (50 T). For the duration of the extension of the road, a 157.0 m long road with a temporary folding bridge was designed. 4 culverts were designed to conduct water from road ditches and drainage ditches. Construction of the provincial road on a length of approx. 1.8 km, reconstruction of junctions with the existing road network, reconstruction and construction of public and individual exits. Reconstruction of telecommunications and electricity networks, construction of traffic safety elements. (English)
20 October 2020
0 references
Identifiers
RPOP.06.01.00-16-0006/16
0 references