Revitalisation of the spa area of the centre of Muszyna (Q114459): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:37, 29 October 2020
Project Q114459 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of the spa area of the centre of Muszyna |
Project Q114459 in Poland |
Statements
11,552,628.52 zloty
0 references
17,773,274.74 zloty
0 references
65.0 percent
0 references
16 November 2015
0 references
31 December 2020
0 references
MIASTO I GMINA UZDROWISKOWA MUSZYNA
0 references
W projekcie realizowane będą: 1 opracowanie niezbędnej dokumentacji w tym Programu Rewitalizacji, dokumentacji technicznej m.in. projektu budowlanego i analizy finansowej i ekonomicznej, 2 przebudowę nawierzchni płyty rynku, odrestaurowanie piwnic wraz z wykonaniem obiektu o funkcji kulturowej Ratusz uwzględniającego m.in. zagospodarowanie pomieszczeń pełniących funkcje muzealne, punktu poboru wody mineralnej, stylizowaną sala ślubów, taneczna itd.. Parametry obiektu przedstawiają się następująco: wys.11,83m, dł.23,05m, szer.17,50 m, pow. użytk.984,59m2. Liczba kondygnacji: 2 nadziemne i 1 podziemna. Zaprojektowano budynek w miejscu istniejących reliktów archeologicznych. Budynek kształtem nawiązuje do stylistyki budynków publicznych z regionu Sądecczyzny, na planie złożonym z prostokątów wielkością i lokalizacją nawiązujący do istniejących ruin. Obiekt nakryty dachem o niewielkim spadku otoczonym attyką. Zaprojektowano układ konstrukcyjny budynku w konstrukcji szkieletu żelbetowego z żelbetowymi stropami i żelbetowym stropodachem, klatkami schodowymi. Ściany wewn. wykończone tynkiem i okładzinami ściennymi tapety, detale architektoniczne. Wykończenie zewn. tynk zewnętrzny.3 rewitalizację ulicy Kościelnej, poprzez modernizację nawierzchni jezdni, chodnika, oświetlenia i kanalizacji burzowej. W ramach prac zw. z rewitalizacją uli i nawierzchni płyty rynku objętych rewitalizacją będzie 1,61 ha pow. Prace w tym zakresie dot.będą gł. remontu dróg w tym zmianie nawierzchni, istniejących chodników, przebudowy oświetlenia drogowego, remont istniejących urządzeń infrastruktury techn. itd.4 prace inspektora nadzoru,5 działania zw.z promocją i zarządzaniem projektem. (Polish)
0 references
The project will be implemented by: 1 elaboration of necessary documentation including the Revitalisation Programme, technical documentation, among others, construction project and financial and economic analysis, 2 reconstruction of the surface of the market slab, restoration of cellars with a cultural function City Hall, including the development of premises performing museum functions, mineral water collection point, stylised wedding hall, dance hall, etc. The parameters of the object are as follows: height 11.83 m, length 23.05 m, width 17.50 m, area area.984.59 m². Number of floors: Above ground and underground. The building was designed at the site of existing archaeological relics. The building’s shape refers to the style of public buildings in the Judeec region, on a plan consisting of rectangles in size and location referring to the existing ruins. The object is covered by a roof with a small drop surrounded by an attic. The structure of the building was designed in the structure of a reinforced concrete frame with reinforced concrete ceilings and reinforced concrete stropodache, staircases. Interior walls finished with plaster and wall coverings wallpaper, architectural details. External plaster finish.3 revitalisation of Kościelna Street, through modernisation of the road pavement, pavement, lighting and storm drainage. As part of the work on the revitalisation of hives and paving of the market covered by the revitalisation, the area will be 1.61 ha. Work in this area will focus on road renovation, including pavement changes, existing sidewalks, road lighting reconstruction, renovation of existing technical infrastructure facilities, etc.4 supervision inspector’s work,5 activities with the promotion and management of the project. (English)
20 October 2020
0 references
Identifiers
RPMP.11.02.00-12-0791/17
0 references