Improving the energy efficiency of the public utility building PSP in Łosiów (Q114890): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:23, 29 October 2020
Project Q114890 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of the public utility building PSP in Łosiów |
Project Q114890 in Poland |
Statements
683,942.65 zloty
0 references
864,811.24 zloty
0 references
79.09 percent
0 references
8 December 2016
0 references
21 September 2018
0 references
GMINA LEWIN BRZESKI
0 references
Przedmiotem projektu jest kompleksowa termomodernizacja energetyczna budynku użyteczności publicznej, Szkoły Podstawowej w Łosiowie, w Gminie Lewin Brzeski. W ramach projektu zostaną wykonane następujące prace termo.: 1. Ocieplenie ścian zewnętrznych o powierzchni 943,61 m2 styropian gr. 16 cm, metodą bezspoinową. 2. Zabudowanie okien frontowych o powierzchni 73,78 m2 oknami z PCV <= o U=0,9 W/m2K z nawiewnikami automatycznymi lub higrosterowanymi. 3. Zabudowanie drzwi o pow. 14,26 m2 drzwiami z PCV lub al <= o U=1,3 W/m2K. 4. Docieplenie stropodach budynku głównego o powierzchni 533,39 m2 wełną mineralną o gr. 25 cm wraz z remontem dachu. 5. Wymiana oświetlenia na energooszczędne. 5. Instalacja elektryczna: montaż paneli fotowoltaicznych. 6. Instalacja odgromowa. 7. Wprowadzenie Systemu Zarządzenia Energią w kotłowni. 8. Utworzonie tzw. zielonej ściany (np.bluszcz, dławisz). Produkty realizacji projektu: - Liczba zmod. energetycznie budynków - 1 szt. - Liczba wybudowanych jedn. wytwarzania energii elektrycznej z OZE - 1szt. - Pow. użytkowa budynków poddanych term. - 1203,40m2. Projekt nie dotyczy obiektu zabytkowego. Wynika z Planu Gospodarki Niskoemisyjnej dla Gminy Lewin Brzeski, który został przyjęty uchwałą Rady Miejskiej w Lewinie Brzeskim w dniu 29 listopada 2016 r. numer XXV/244/2016 jako przedsięwzięcie średnioterminowe przewidziane do realizacji na lata 2017-2022 (por. s. 102 dokumentu, który jest dostępny na stronie internetowej http://www.prawomiejscowe.pl/institution/18390/legalact/950/18390). Projekt ujęty jest w PGN w Harmonogramie rzeczowo – finansowym przewidzianych do realizacji zadań krótkoterminowych i średnioterminowych, w zadaniu 5: Publiczna Szkoła Podstawowa w Łosiowie - docieplenie ścian i stropodachu, częściowa wymiana stolarki okiennej i drzwiowej oraz inteligentne systemy sterowania oświetleniem itp. Wnioskodawcą i Beneficjentem projektu jest Gmina Lewin Brzeski, która będzie odpowiedzialna za realizację projektu i utrzymanie trwałości. (Polish)
0 references
The subject of the project is a comprehensive thermal modernisation of the public utility building, Primary School in Łosiów, Lewin Brzeski Municipality. The following thermal works will be carried out within the project: 1. Warming of the outer walls with an area of 943,61 m² gr. 16 cm styrofoam, with a seamless method. 2. Front windows with an area of 73.78 m² with PVC windows <= with U=0.9 W/m2K with automatic or hygrostered vents. 3. Building up the door on the wall. 14,26 m² PVC or al <= with U=1.3 W/m2K. 4. Warming of the main building with an area of 533.39 m² with mineral wool of 25 cm with roof renovation. 5. Replacement of lighting for energy-efficient. 5. Electrical installation: installation of photovoltaic panels. 6. It’s a lightning strike. 7. Introduction of the Energy Management System in the boiler room. 8. Creation of the so-called green wall (e.g.blue, choking). Products of the project: — Number of energy modules of buildings – 1 pieces. — Number of single-built electricity generation from RES – 1pcs. — Usable buildings subjected to thermal treatment. — 1203,40 m². The project does not apply to the historical object. It follows from the Low-Emission Economy Plan for the Municipality of Lewin Brzeski, which was adopted by a resolution of the Municipal Council in Lewin Brzeski on 29 November 2016 No XXV/244/2016 as a medium-term project to be implemented for the years 2017-2022 (cf. page 102 of the document, which is available on the website http://www.prawomiejscowe.pl/institution/18390/legalact/950/18390). The project is included in the PGN in the Commitment and Financial Schedule for short-term and medium-term tasks, in task 5: Public Primary School in Łosiów – warming of walls and ceilings, partial replacement of window and door carpentry and intelligent lighting control systems, etc. The applicant and beneficiary of the project is the Municipality of Lewin Brzeski, which will be responsible for project implementation and sustainability. (English)
20 October 2020
0 references
Identifiers
RPOP.03.02.02-16-0008/17
0 references