With tradition in modernity – Music Manor in Lipnica Wielka (Q112739): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:06, 29 October 2020
Project Q112739 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | With tradition in modernity – Music Manor in Lipnica Wielka |
Project Q112739 in Poland |
Statements
1,961,195.95 zloty
0 references
2,801,708.65 zloty
0 references
70.0 percent
0 references
1 June 2016
0 references
31 December 2018
0 references
GMINA KORZENNA
0 references
Dwór i park w Lipnicy Wielkiej są wpisane do rejestru zabytków: park wpisany do rejestru zabytków Woj. Nowosądeckiego - decyzja z dnia 14.12.1987r. L.dz.KL.II.- 5347/1/87 pod numerem rejestru Kś.A.-523; dwór wpisany z dniem 29.10.2008 r. do rejestru zabytków Woj. Małopolskiego pod numerem A-160/M. W ramach zadania: „Restauracja zabytkowego dworu w Lipnicy Wielkiej” przewidziano odrestaurowanie (remont, rozbudowę i przebudowa) dworu w Lipnicy Wielkiej ze zmianą sposobu użytkowania na budynek użyteczności publicznej (usługi w zakresie kultury). Rozbudowa obejmuje wykonanie 2 ganków przy ścianach szczytowych. Przebudowa i remont: cały budynek. Na poddaszu zaprojekt. adaptację części nieużytkow. strychu oraz przebudź. pozostałej części strychu. Na kondygnacji piwnic zaprojekt. lokalne obniżenie posadzki dla dostos .do obow. przepisów, funkcja i przeznaczenie pomieszczeń bez zmiany. Obiekt wyposażony zostanie w instalację: wod.-kan., c.o. (kotłownia gazowa), wentylację mech. naw.-wyw. z funkcją klimatyzacji, elektr. z instal. odgromową, teletechniczną (telekom., sieć lan), instalację p.poż (hydranty, oddymianie klatki schodowej, instal. sygnal. pożaru), instalację kanalizacji deszczowej z odprow. wód opadowych do szczelnych zbiorników. Zaprojekt. instalację kanalizacji deszczowej do zagospod. wód opadowych z terenów dachu i parkingu, które będą gromadzone w zbiornikach do nawadniania terenów zielonych, ich nadmiar zostanie rozprow. na tereny biologicznie czynne. W projekcie archit. – bud. przyjęto materiały i urządzenia spełniające wymogi oszczędź. energii, przegrody zaprojekt. dla zapewnienia właściwej izol. cieplnej, moce urządzeń grzewczych dostosowano do zapatrz. obiektu. Ze względu na ograniczenie ilości znaków (wprowadzone w wyniku zmian technicznych w generatorze i niezależne od Wnioskodawcy) pozostała treść niniejszego punktu została zamieszczona w punkcie Q Wniosku. (Polish)
0 references
The manor and park in Lipnica Wielka are entered in the register of monuments: the park is listed in the Register of Historical Monuments of Woj. Nowy Sądecki – decision of 14.12.1987r. L.dz.KL.II.- 5347/1/87 under the register number of Fr.A.-523; the manor was entered on 29.10.2008 in the Register of Historical Monuments Woj. Małopolska under number A-160/M. As part of the task: The “Restaurant of the historic manor house in Lipnica Wielka” provides for the restoration (refurbishment, extension and reconstruction) of the manor house in Lipnica Wielka with a change of use to a public utility building (cultural services). The extension includes the construction of 2 porches at the peak walls. Reconstruction and refurbishment: the whole building. Design in the attic. adaptation of waste parts. attic and waking up the rest of the attic. On the floor of the cellars the design. local floor reduction for the application of regulations, function and use of premises without change. The facility will be equipped with an installation of: water-channel, central heating (gas boiler), mechanical ventilation with air conditioning function, electric lightning, telecommunication (telekom., lan network), fire fire installation (hydrants, smoke of stairways, fire alarm system), installation of rainwater drainage from drainage water to tight tanks. Project. installation of rainwater drains for rainwater from roof and parking areas, which will be collected in tanks for irrigation of green areas, their excess will be dispersed into biologically active areas. In the archit project. — construction materials and devices that meet the requirements of energy saving, partition design. to ensure proper heat insulation, the power of heating equipment has been adapted to the object. Due to the limitation of the number of characters (as a result of technical changes to the generator and independent of the Applicant), the remainder of this paragraph is given in paragraph Q of the Application. (English)
20 October 2020
0 references
Identifiers
RPMP.06.01.01-12-0100/16
0 references