GREEN ENERGY IN THE COMPANY SERVICE COMPANY ESAM ANASTAZJA HANNA SIENICKA (Q116791): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:05, 29 October 2020
Project Q116791 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | GREEN ENERGY IN THE COMPANY SERVICE COMPANY ESAM ANASTAZJA HANNA SIENICKA |
Project Q116791 in Poland |
Statements
90,640.0 zloty
0 references
113,300.0 zloty
0 references
80.0 percent
0 references
8 November 2018
0 references
30 August 2019
0 references
PRZEDSIĘBIORSTWO HANDLOWO USŁUGOWE ESAM ANASTAZJA HANNA SIENICKA
0 references
W wyniku wdrożenia projektu Wnioskodawca będzie posiadał instalację i urządzenia produkujące energię elektryczną wykorzystując energię promieniowania słonecznego o mocy 25,62 kWp. Planowany termin realizacji projektu maj-lipiec 2019r. Celem głównym realizowanego projektu jest wytwarzanie energii elektrycznej z OZE na potrzeby własne firmy, co pozwoli na ograniczenie emisji CO2.Cel ten realizowany będzie poprzez instalację urządzeń pozwalających na produkcję energii z OZE Celem operacyjnym jest: • budowa instalacji OZE o mocy 25,62 kWp W wyniku której realizowane będą cele szczegółowe • Produkcja energii elektrycznej z OZE • Zmniejszenie emisji zanieczyszczeń do atmosfery Projekt wprost realizuje Cel szczegółowy: Zwiększony udział rozproszonej produkcji energii ze źródeł odnawialnych Działania 5.1 RPOWP. Projekt dotyczy budowy elektrowni fotowoltaicznej Realizacja projektu przyczyni się do zwiększenia udziału energii odnawialnej w produkcji energii ogółem. Efektem realizacji działań będzie redukcja emisji CO2 i poprawa stanu środowiska. Projekt objęty pomocą de minimis. Całkowite koszty projektu 139359,00 zł, koszty kwalifikowalne 113300,00 zł, oczekiwana wartość wsparcia pomoc de minimis 80% - 90640,00zł. (Polish)
0 references
As a result of the implementation of the project, the applicant will have an installation and equipment producing electricity using solar energy of 25,62 kWp. Planned date of implementation of the project May-July 2019 The main objective of the project is to generate electricity from RES for the own needs of the company, which will allow to reduce CO2 emissions.This objective will be realised by installing devices allowing the production of energy from RES The operational objective is to: • Construction of RES installations with a power of 25.62 kWp As a result of which the specific objectives will be implemented • Manufacture of electricity from RES • Reducing emissions of pollutants into the atmosphere The project directly fulfils the specific objective: Increased share of distributed renewable energy production Measures 5.1 RPOWP. The project concerns the construction of a photovoltaic power plant The project will contribute to increasing the share of renewable energy in total energy production. The implementation of the measures will result in reducing CO2 emissions and improving the environment. De minimis project. Total project costs PLN 139359.00, eligible costs 113300.00 PLN, expected value of de minimis aid 80 % – PLN 90640.00. (English)
20 October 2020
0 references
Identifiers
RPPD.05.01.00-20-0187/17
0 references