Thermal modernisation of the building of the Klembów Municipality and School Complex in Ostrów (Q108954): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 12:17, 29 October 2020
Project Q108954 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building of the Klembów Municipality and School Complex in Ostrów |
Project Q108954 in Poland |
Statements
1,471,096.6 zloty
0 references
1,838,870.75 zloty
0 references
80.0 percent
0 references
1 January 2016
0 references
31 December 2017
0 references
GMINA KLEMBÓW
0 references
Projekt termomodernizacji dwóch budynków użyteczności publicznej znajdujących się na terenie wiejskiej Gminy Klembów, będących przedmiotem wniosku o dofinansowanie, składa się z zestawu zadań, które zostały szczegółowo przedstawione w Studium Wykonalności w Podrozdziale 5.4. Przedmiotem wniosku będą jedynie te zadania, których koszt realizacji należy do kategorii kosztów kwalifikowanych w ramach Konkursu, a równocześnie których wykonanie wynika bezpośrednio z przeprowadzonych audytów energetycznych, oraz prace przygotowawcze, inwestycyjne i związane z procesem inwestycyjnym, których kwalifikowalność wynika z Zasad Kwalifikowalności Wydatków w ramach RPO WM. W projekcie ujęty został również koszt przeprowadzenia audytów energetycznych po zakończeniu inwestycji. Studium Wykonalności wykazuje, że uzasadnione jest objęcie tego przedsięwzięcia wsparciem w ramach RPO WM 2014-2020, ze względu na: 1. Stopień poprawy efektywności energetycznej zespołu budynków – 68,92% (69,17%-UG Klembów, 68,84% ZS Ostrówek) 2. Podwyższenie standardu energetycznego zespołu budynków, wyrażone wskaźnikiem EPh + w – 61,87kWh/(m2 x rok) 3. Efektywność kosztowa – 4,70zł/ kWh/rok 4. Stopień redukcji CO2 - 66,6% 5. W każdym z budynków, wykonane zostanie 6 zadań wpływających na kompleksowość działań termomodernizacyjnych – tabela 1.1 Studium Wykonalności, m.in. wykorzystane zostanie OZE poprzez budowę instalacji fotowoltaicznej na budynku Urzędu Gminy Klembów 6. Inwestycja jest ujęta w przyjętym Planie Gospodarki Niskoemisyjnej dla Gminy Klembów, dostępnym na www.klembow.pl Zaprezentowane wskaźniki są na poziomie przewyższającym doświadczenia dotychczasowych instrumentów pomocowych publikowanych w Polsce. Przygotowywany do realizacji projekt inwestycyjny obejmuje wszystkie zadania, które sprawiają, że efektem realizacji projektu jest stworzenie w pełni funkcjonalnej i operacyjnej infrastruktury, bez konieczności realizacji dodatkowych zadań inwestycyjnych nie uwzględnionych w tym proje (Polish)
0 references
The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from the energy audits carried out, as well as preparatory, investment and related work related to the investment process, the eligibility of which results from the Eligibility Principles of Expenditure under the ROP WM. The project also includes the cost of carrying out energy audits after completion of the investment. The feasibility study shows that it is justified to support this project under WM2014 ROPs, due to: 1. Energy efficiency improvement of the building complex – 68.92 % (69.17 %-UG Klembów, 68.84 % ZS Ostrówek) 2. Increase of the energy standard of building complex, expressed in Eph + in – 61,87 kWh/(m² x year) 3. Cost efficiency – 4.70zł/kWh/year 4. CO2-66.6 % reduction rate 5. In each of the buildings, 6 tasks will be performed affecting the complexity of thermomodernisation activities – Table 1.1 The Feasibility Study, among others, will be used RES through the construction of a photovoltaic installation on the building of the Klembów Municipality 6. The investment is included in the adopted Low-Emission Economy Plan for Klembów Municipality, available at www.klembow.pl The presented indicators are at a level exceeding the experience of existing aid instruments published in Poland. The investment project under preparation covers all tasks that make it possible to create a fully functional and operational infrastructure without the need for additional investment tasks not included in this project. (English)
17 October 2020
0 references
Identifiers
RPMA.04.02.00-14-4592/16
0 references