CONSTRUCTION OF SANITARY SEWAGE SYSTEM WITHIN THE BEAR AGGLOMERATION – STAGE II (Q105586): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 12:00, 29 October 2020

Project Q105586 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF SANITARY SEWAGE SYSTEM WITHIN THE BEAR AGGLOMERATION – STAGE II
Project Q105586 in Poland

    Statements

    0 references
    3,352,407.33 zloty
    0 references
    804,577.76 Euro
    13 January 2020
    0 references
    3,944,008.64 zloty
    0 references
    946,562.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 April 2018
    0 references
    30 November 2021
    0 references
    GMINA NIEDŹWIADA
    0 references
    W ramach projektu planuje się budowę sieci kanalizacji sanitarnej w trzech miejscowościach na ter. gminy: Klementynów, Brzeźnica Książęca-Kolonia i Górka Lubart. Zadanie będzie realiz. na terenie aglomer. Niedźwiada (2041 RLM - AKPOŚK 2017). Par. sieci na terenie Brzeźnicy Książęcej: - kanalizacja sanit. grawitacyjna PVC dn 200 i 160 mm: 1861,6 m, PE100- 216,0m - rurociągi tłoczne PE 110 mm: 3120 m, - przepompownie ścieków: 2 kpl. Par. sieci na terenie Górki Lubartowskiej: - kanalizacja sanit. grawit. PVC dn 200 i 160 mm: 6924,4 m, PE100 -137,0m - rurociągi tłoczne PE 110 mm: 1771,0 m, - przepompownia śc. - 3 kpl. Parametry sieci na ter.: Klementynowa: - kanał D - PVC 200x5,9: 1319,0 m, - kanał K - PVC 200x5,9: 1381,0 m, - kan. sanit. grawit. PVC dn160- 800,0m, - rurociąg tłoczny PE110 - 1400,0m - pomp. ścieków - 1 kpl. Z wybudowanej sieci będzie mogła skorzystać większa liczba gospod. dom., zaś poziom świadcz. usług zostanie zwiększ. i rozszerzony (eBOK, zakup wodom. z funkcją rad. odczytu - tylko w budynkach objęt. dostępem do kan. sanit. , zakup urządz. do pomiaru ilości i jakości ścieków oczyszcz.). Stopień osiągania celów mierzony będzie następując. wskaźn.: Wsk. produktu: Dług. Wybud. kana. sanit.-18,93 km (w tym 9,42 km koszty kwalif/ - wskaźnik produktu - zgodnie z załącz. dok. kosztorys.). Wsk. rezultatu: Przewidyw. liczba os. korzystających z ulepszonego oczyszczania ścieków-1390 RLM. Liczba dodatkowych os. Korzyst. z ulepsz. Oczyszcz. ścieków (CI19)-1390 RLM. Interesariusze głów.: pracownicy UG N., Zespól proj.; Zarząd Woj.. Lub., Dep. Wdrażania EFRR Urzędu Marszałk. Woj. Lub., wykonawcy inwes., Inspektor nadzoru bud., Podmioty doradcze. Interes. drugorzędni: mieszkańcy bezpośr. korzyst. z rozwiąż. ramach proj., pozostali mieszkańcy GSz; Osoby nie objęte systemem gosp. ściekowej Gm.; Podmioty gosp. funkcjonujące w Gm.. Interes. kontekstowi: Gm. konkurujące o środki w ramach przedmiot. konkursu, Os. narażone na negaty. Oddział. prac budow., lokal. media. (Polish)
    0 references
    The project plans to build a sanitary sewerage network in three towns on the commune’s territory: Clementine, Prince Cologne and Górka Lubart. The task will be carried out. on the agglomer area. Bear (2041 RLM – ACPOŚK 2017). Pair of networks in Brzeźnica Príncipe: — sanitary sanitary drainage. PVC dn 200 and 160 mm gravitational drain: 1861.6 m, PE100-216.0 m – PE 110 mm pressing pipelines: 3120 m, – sewage pumping plants: 2 kpl. Pair of networks in the area of Górka Lubartowska: — sanit sanit. gravitational drainage. PVC dn 200 and 160 mm: 6924.4 m, PE100-137.0 m – PE 110 mm pressing pipelines: 1771.0 m, a shaft pumping station. — 3 kpl. Network parameters per ter: Clementine: — channel D – PVC 200x5,9: 1319,0 m, – K channel – PVC 200x5,9: 1381.0 m, can. sanit. gravity. PVC dn160-800.0 m, – PE110-1400.0 m – pump. sewage – 1 kpl. The built network will be able to use a larger number of gospods. House., while the level of services will be increased and extended (eBOK, purchase by water. with the function of advice. reading – only in buildings covered. access to kan. sanit. Purchase of equipment. for measuring the quantity and quality of sewage cleanse.). The degree of achievement of the targets will be measured as follows: Product Specification: It’s a debt. Erect. kana. sanit.-18.93 km (incl. 9,42 km of qualif/- product indicator – according to the annex. doc. financial statement.). For the result: Predict the number of people using improved wastewater treatment-1390 RLM. Number of additional wasps. Take advantage of the upgrades. Waste water treatment (CI19)-1390 RLM. Stakeholders of the heads: employees of UG N., Project Team; The War Board. Or.., Dep. Implementation of the ERDF of the Office Marshal. It’s a war. Or., contractors inwes., Inspector of supervision building., advisory entities. Second-rate interests: residents directly benefiting from the solution of the project, the remaining inhabitants of GSz; Persons not covered by the sewage management system Gm.; Entities operating in Gm. An Interest in Context: Gm. competing for measures within the subject. competition, Os. exposed to negates. Division. Construction works., premises. media. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0007/17