(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 11:56, 29 October 2020

Project Q104640 in Poland
Language Label Description Also known as
English
INSTALLATION OF SOLAR COLLECTORS AND C.O. BIOMASS-FIRED BOILERS IN THE MUNICIPALITY OF DZWOLA
Project Q104640 in Poland

    Statements

    0 references
    4,296,368.26 zloty
    0 references
    1,031,128.38 Euro
    13 January 2020
    0 references
    5,054,550.9 zloty
    0 references
    1,213,092.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 April 2016
    0 references
    30 November 2018
    0 references
    GMINA DZWOLA
    0 references
    0 references
    Teren P. obejmuje 17 miejsc. w GDz. Zakres P. zakłada instalację 429 szt. zestaw. kol. słon.(258 szt. 2-panelowych i 171 3-panelowych) posadowionych wyłącznie na dachach lub elewacjach i 81 kotłów na bioma (10szt.-15 kW, 24szt.-20kW, 32szt.-25 kW 9szt.-30kW i 6szt.-35 kW) w obiekt. prywat. do podgrz. CWU o sum. mocy 3,22712MW (1,32MW kolektory i 1,91 MW piece). P. przewid. również zaprojekt. i wykon. portalu internet., kt będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna l. mieszk. GDz korzyst. (GRUPA DOCELOWA) z efektów realiz. P. wyniesie ok. 2040 w 510 obiekt. Instalacje, będące przez cały okres trwałości (5lat) własn. GDz zost. usytuow. na budyn. stanow. własn. osób prywat., z kt GDz. podpisała um. użycz. GŁÓWNYM CELEM P. jest zwiększ. stosow. OZE na terenie GDz. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarz. czystej energii wśród mieszk. poprzez powsz. montaż OZE na terenie gminy [3,22712MW w 2018r.].; CEL 2: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. Indy wid. Instal. wykorzysta. OZE [2129,54 Mwht/rok od 2019r.]; CEL 3: Reduk. zanieczyszcz. powietrza atmosf. poprzez zmniejsz. emisji związków szkodl. dzięki zwiększ. udziału energii ze źródeł odnawialnych [1234,22 t. ekwiwal. CO2 / rok od 2019r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL. P., obok korz. społ. i gosp. będzie wpływ. na skuteczniejsze przeciwdzi. zmianom klimatu. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. informac. [uruch. serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GDz. Usytuow. jest w (OSI): Obsz. gospod. wykorzystania walorów przyrod. i kultur. P. w części realizow. będzie na obsz. Nat.2000. (Polish)
    0 references
    The area of P. comprises 17 places. Scope P. assumes installation of 429 sets of salts (258 pcs. 2-panel and 171 3-panel) planted exclusively on roofs or facades and 81 bioma boilers (10 pieces-15 kW, 24pcs-20 kW, 32pcs-25 kW 9pcs-30 kW and 6pcs.-35 kW) in the object. CWU with a total power of 3,22712 MW (1,32 MW collectors and 1,91 MW furnaces). P. predicts also the project. and execution of the Internet portal, which will perform the functions of educator, promoc. and offer online services. Total l. bellow. Take advantage of it. (target GRUPA) with the effects of implementations. P. is going to be ok. 2040 in 510 subject. Installations, which are throughout the shelf life (5 years) own. Places on the state’s own private individuals with whom GDz. signed um. lend. The main CELEM P. is increase. RES in the area of Gdz. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. produce clean energy among inhabitants through the overhead assembly of RES in the commune [3,22712 MW in 2018]; OBJECTIVE 2: Reduce the financial burden. local community results. from energetic fees thanks to creation. The Indy wid. Instal. will use it. RES [2129,54 Mwht/year from 2019]; OBJECTIVE 3: Reduce. air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources [1234.22 t. equivalent. CO2/year from 2019]. P. learn to pursue both the priority objective. 4 (found. support for the production and extinguishing.. ener. come from RES) as well as the main target. RPO WL. P., in addition to the social cortex and the gosp. will have an impact on the more effective fight against climate change. P. entry. to the objectives of OPERAC. (2.5- Equipment. Oh, no, no. Infrastr. transp., commune, energet.; 3.6 – Development of social information. [running serve. www] in stand. WCAG 2.0]; 4.5 – Rational and effective use of resources for the needs of gossip and recreation, at maintenance and protection of the values of Wednesday. Nature) indication in SRWL 2014-2020. No, no, no. The situation is in (OSI): Visitor’s use of nature and cultures. P. in part of the realisations will be on. Nat.2000. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0013/16
    0 references