Thermal modernisation and improvement of energy efficiency of two blocks of the “Skarpa” Cooperative in Fajsławice (Q105498): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q105498 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q105498 w Polsce |
Revision as of 11:41, 29 October 2020
Project Q105498 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation and improvement of energy efficiency of two blocks of the “Skarpa” Cooperative in Fajsławice |
Project Q105498 in Poland |
Statements
1,542,602.55 zloty
0 references
2,320,173.13 zloty
0 references
66.49 percent
0 references
22 January 2019
0 references
30 November 2021
0 references
SPÓŁDZIELNIA BUDOWLANO-MIESZKANIOWA "SKARPA"
0 references
Celem głównym projektu jest poprawa jakości środowiska naturalnego poprzez termomodernizację budynków mieszkalnych zlokalizowanych przy ul. Fajsławice 108A i 108B w Fajsławicach. Realizacja projektu posłuży zmniejszeniu zapotrzebowania na energię cieplną w budynkach. Ponadto przeprowadzenie procesu kompleksowej termomodernizacji przyczyni się do redukcji zanieczyszczenia powietrza atmosferycznego i poprawy jego czystości. Stanie się to dzięki zmniejszeniu emisji CO2 i innych gazów cieplarnianych oraz pyłów do atmosfery. W konsekwencji inwestycja poprawi komfort życia mieszkańców budynków objętych projektem (zmniejszenie kosztów eksploatacji) jak również mieszkańców gminy (poprawa jakości środowiska naturalnego). Projekt obejmuje poprawę efektywności energetycznej budynków mieszkalnych przy ul. Fajsławice 108A i 108B poprzez m.in.: 1. Prace związane z branżą budowlaną- kwalifikowalne: 1.1. Roboty rozbiórkowe obejmujące prace umożliwiające montaż stolarki okiennej i drzwiowej oraz docieplenie przegród dachu czy lukarn. 1.2. Prace obejmujące docieplenie przegrody stropu piwnic. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody. 1.3. Prace obejmujące wymianę okien oraz montaż nawiewników ciśnieniowych. 1.4. Prace obejmujące wymianę drzwi wraz z pracami odtworzeniowymi. 1.5. Dostarczenie i montaż głowic termostatycznych, termozaworów cyrkulacji i licznika ciepła. 1.6. Prace obejmujące docieplenie przegrody cokołu. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody wraz z wykończeniem. 1.7. Prace obejmujące docieplenie przegrody lukarn. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody wraz z wykończeniem. 1.8. Prace obejmujące zamurowanie otworów okiennych wraz z wykończeniem. Projekt w przeciwdziała ubóstwu energetycznemu oraz spełnia warunki ex-ante z dyrektywy 2006/32/EC. (Polish)
0 references
The main objective of the project is to improve the quality of the environment through thermal modernisation of residential buildings located on the street. Fajsławice 108A and 108B in Fajsławice. The implementation of the project will help reduce the demand for thermal energy in buildings. In addition, a comprehensive thermal modernisation process will contribute to reducing atmospheric air pollution and improving its purity. This will be done by reducing emissions of CO2 and other greenhouse gases and dust into the atmosphere. As a result, the investment will improve the comfort of living for residents of the buildings covered by the project (reducing operating costs) as well as local residents (improving the quality of the environment). The project includes improving the energy efficiency of residential buildings at ul. Fajsławice 108A and 108B through, among others: 1. Works related to the construction industry – eligible: IT’S 1.1. Demolition works including works enabling the installation of window and door carpentry as well as warming of roof partitions or gaps. IT’S 1.2. Works including warming of the cellar ceiling partition. Includes both the preparation of the substrate as well as the insulation of the partition. IT’S 1.3. Works including window replacement and installation of pressure vents. IT’S 1.4. Works involving the replacement of doors and replacement works. IT’S 1.5. Supply and installation of thermostatic heads, circulation thermovalves and heat meters. IT’S 1.6. Works including warming of the plinth partition. Includes both the preparation of the substrate as well as the insulation of the partition with the finishing. IT’S 1.7. Works including warming of the gap compartment. Includes both the preparation of the substrate as well as the insulation of the partition with the finishing. IT’S 1.8. Works including walling of window openings with finishing. The project addresses energy poverty and fulfils the ex-ante conditions of Directive 2006/32/EC. (English)
17 October 2020
0 references
Identifiers
RPLU.05.03.00-06-0020/19
0 references