Thermomodernisation of the Primary School in Pavlov (Q105432): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 11:39, 29 October 2020
Project Q105432 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermomodernisation of the Primary School in Pavlov |
Project Q105432 in Poland |
Statements
457,806.96 zloty
0 references
538,596.43 zloty
0 references
85.0 percent
0 references
10 October 2016
0 references
28 November 2022
0 references
GMINA REJOWIEC FABRYCZNY
0 references
Celem głównym projektu jest poprawa efektywności zarządzania i wykorzystania energii w budynku SP w Pawłowie poprzez termomodernizację oraz zastosowanie odnawialnych źródeł energii. Obiekt nie jest objęty ochroną konserwatorską. Wykonane zostaną prace termomodernizacyjne SP w Pawłowie, której powierzchnia użytkowa wynosi: 926,20 m2. Ich zadaniem będzie docieplenie budynku, wymiana posadzek na parterze i w piwnicy, docieplenie stropu budynku między piętrem a nie ogrzewanym poddaszem. Wykonane zostaną roboty dotyczące sprawdzenia istniejącej wentylacji grawitacyjnej i uzupełnienia jej w pomieszczeniach typu sanitariaty. Wymieniona zostanie instalacja elektryczna na piętrze budynku, zmodernizowana instalacja c.o. i instalacja wodna. Zakupiony i zamontowany będzie kompletny 3 kolektorowego zestaw solarny o mocy 4,6 kW z pełnym osprzętem i biwalentnym (dwuwężownicowym) pojemnościowym podgrzewaczem wody umożliwiającym podłączenie drugiego źródła tj. istniejącego kotła co. (wybór tej technologii wskazano w audycie energetycznym, str. 32). Instalacja OZE w całości będzie przeznaczona na potrzeby budynku szkoły. Wymienione również zostanie oświetlenie na LED. W ramach kosztów niekwalifikowalnych zostaną wykonane następujące roboty: roboty rozbiórkowe i drobne roboty budowlane oraz ocieplenie części budynku, w której znajduje się lokal mieszkalny, a także remont dachu wraz z rynnami i obróbkami blacharskimi. W wyniku realizacji projektu wskaźnik efektywności energetycznej dla obiektu szkolnego wyniesie 53,5%. Zmniejszy się roczne zużycie energii pierwotnej to wartość 126 987,02 kWh/rok. Emisja CO2 w ciągu roku zmniejszy się o 25,44 tony równoważnika CO2. Zastosowane rozwiązania techniczne umożliwią oszczędność energii cieplnej w ilości 340,8 GJ/ rok oraz elektrycznej 3,22 MWh/rok. Produkcja energii cieplnej z nowo wybudowanej instalacji solarnej wyniesie 2,86 MWht/rok. Projekt realizowany będzie na terenie objętym Lokalnym Planem Rewitalizacji. (Polish)
0 references
The main objective of the project is to improve the efficiency of energy management and use in the SP building in Pawlow through thermal modernisation and the use of renewable energy sources. The facility is not covered by conservation protection. The thermal modernisation works of the SP in Pawlow will be carried out, the usable area of which is: 926,20 m². Their task will be to warm the building, replace the floors on the ground floor and in the basement, warm the ceiling of the building between the floor and the unheated attic. Work will be carried out on checking the existing gravity ventilation and replenishing it in sanitary facilities. The electrical system on the floor of the building will be replaced, the modernised central heating system and the water installation will be replaced. A complete 3 collector solar set with a power of 4.6 kW will be purchased and installed with full equipment and bivalent (two-conveyor) capacitive water heater allowing to connect a second source, i.e. the existing boiler co. (choice of this technology is indicated in the energy audit, p. 32. The RES installation will be entirely dedicated to the needs of the school building. LED lighting will also be replaced. The following work will be carried out under ineligible costs: demolition works and small construction works as well as warming of the part of the building where the dwelling is located, as well as overhaul of the roof, along with gutters and sheet metalworking. As a result of the project, the energy efficiency ratio for the school facility will be 53.5 %. The annual primary energy consumption will be reduced to 126987,02 kWh/year. CO2 emissions will decrease by 25.44 tonnes of CO2 equivalent over the year. The technical solutions used will save heat in the amount of 340.8 GJ/year and electricity 3.22 MWh/year. The production of thermal energy from the newly built solar system will amount to 2.86 MWht/year. The project will be implemented in the area covered by the Local Revitalisation Plan. (English)
20 October 2020
0 references
Identifiers
RPLU.05.02.00-06-0104/19
0 references