THERMAL MODERNISATION OF PUBLIC BUILDINGS LOCATED IN THE MUNICIPALITY OF NIEMCE (Q105288): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 11:16, 29 October 2020
Project Q105288 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF PUBLIC BUILDINGS LOCATED IN THE MUNICIPALITY OF NIEMCE |
Project Q105288 in Poland |
Statements
1,962,989.07 zloty
0 references
2,309,398.92 zloty
0 references
85.0 percent
0 references
14 September 2016
0 references
31 December 2019
0 references
GMINA NIEMCE
0 references
Q2521728 (Deleted Item)
0 references
Cel. Głów. p. jest poprawa efektywności wykorzystania energii w 3 budynkach użyteczności publicznej położonych na terenie Gminy Niemce. Zakres prac obejmuje m.in.: remont i docieplenie dachu, stropodachu, docieplenie ścian zewnętrznych; podłóg; wymianę stolarki okiennej i luksfera, drzwiowej; montaż nawiewników, inst. odgromową; inst. fotowoltaiczną; wymianę instalacji c.o. i c.w.; inst. oświetleniową, montaż ukł. pomiarowych. koszty niekwalif. -montaż kotłów gazowych, inst. gazową do kotłów, inst. detekcji gazu. Zadania w projekcie: Roboty termomodernizacyjne - GOPS Niemce, Roboty termomodernizacyjne - UG Niemce, Roboty termomodernizacyjne - ZS Krasienin, Dokumentacja techniczna, Audyty energetyczne, SW, Nadzór inwestorski, Kampania informacyjno-promocyjna. W ramach p. zostaną osiągnięte następujące wskaźniki: Prod.: Liczba zmoderniz. en. bud.- 3; Liczba wybudowanych jedn. wytw. energii elektr.-3; Powierzchnia użytkowa budynków poddanych termo. - 3474,9 m2; Dodatkowa zdolność wytwarzania energii z OZE (CI30) - 0,02MW; Dodatkowa zdolność wytw. en. elektrycznej z OZE - 0,02MWe; Rezult.: Ilość zaoszczędzonej en. cieplnej - 1 186,70 GJ/rok; Zmniejszenie rocznego zużycia en. pierw. w bud. publ. (CI32) - 406 523kWh/rok; Szacowany roczny spadek emisji gazów ciepl. (CI34) -121,53tony/rok, Ilość zaoszczędzonej en. elektr. - 48,25 MWh/rok. Zmniejsz. Roczn. Zuż. energii pierw. w bud. publ. (CI32) - 406 523,35 kWh/rok. Produkcja energii elektrycznej z nowo wybudowanych / nowych mocy wytwórczych instal. wykorzysta. OZE - 16,4 MWhe/rok. Grupy docelowe p.: mieszkańcy GN korzystający z usług przedmiotowych placówek. Na podst. PROGR. OCHR.Y POWIET. DLA STREFY LUBELS.J w GN. nie stwierdzono przekr. choćby jednego poziomu dop. lub docel. w odniesieniu do substancji podleg. ocenie jakości powietrza. Dział. przewidziane w P. przyczy. się do realizacji działań napraw. mających na celu popr. stanu jakości powietrza poprzez ogran. emisji pyłu PM10 z syst. grzew. (Polish)
0 references
It’s a target. Głów. p. is improving the efficiency of energy use in 3 public buildings located in the municipality of Germany. The scope of the work includes, among others: renovation and warming of the roof, ceiling, warming of external walls; flooring; replacement of window carpentry and Luxury, door; installation of vents, lightning protection; photovoltaic inst.; replacement of central heating and hot water installations; inst. lighting, installation of measuring systems. costs non-equipment. —assembly of gas boilers, gas inst. for boilers, gas detection. Tasks in the project: Thermal modernisation robots – GOPS Germany, Thermomodernisation robots – UG Germany, Thermomodernisation robots – ZS Krasienin, Technical Documentation, Energy Audits, SW, Investor supervision, Information and Promotional Campaign. The following indicators will be achieved under p.: Prod.: Number of modernisations en. bud.-3; Number of built one electric energy output-3; Usable surface of buildings subjected to heat. — 3474,9 m²; Additional RES generation capacity (CI30) – 0,02 MW; Additional RES electric capacity – 0,02MWe; The result.: Amount of thermal energy saved – 1 186,70 GJ/year; Reduction of annual consumption en. first in the building publ. (CI32) – 406523 kWh/year; Estimated annual decrease in heat gas emissions. (CI34) -121.53 tons/year, Number of saved en. electr. — 48,25 MWh/year. Bring it down. It’s a year. Energy consumption first. in the publ. (CI32) – 406523,35 kWh/year. Electricity production from newly built/new installed capacity will be used. RES – 16,4 MWhe/year. Target groups p.: residents of the GN using the services of the facilities in question. On the subst. IT’S A PROGR. IT’S OCHR. For STREFY LUBELS.J in GN, there was no cross-section of at least one level or target for substances subject to air quality assessment. Section. provided for in P. will be used for the implementation of repair activities aimed at increasing the air quality status through PM10 emissions from the heating system. (English)
20 October 2020
0 references
Identifiers
RPLU.05.02.00-06-0030/16
0 references