Solar energy for Radzyń Podlaski commune (Q104707): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 10:58, 29 October 2020

Project Q104707 in Poland
Language Label Description Also known as
English
Solar energy for Radzyń Podlaski commune
Project Q104707 in Poland

    Statements

    0 references
    4,171,954.98 zloty
    0 references
    1,001,269.20 Euro
    13 January 2020
    0 references
    4,908,182.34 zloty
    0 references
    1,177,963.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 May 2016
    0 references
    29 June 2018
    0 references
    GMINA RADZYŃ PODLASKI
    0 references
    Celem projektu jest poprawa jakości środowiska naturalnego, dywersyfikacja dostaw energii oraz zwiększenie bezpieczeństwa energetycznego. W ramach projektu zostaną zamontowane zestawy kolektorów słonecznych (2, 3 i 4 panelowe) na budynkach mieszkańców gminy Radzyń Podl,łącznie 532 zestawy (1470 paneli) o mocy 1,82133MW. Z kolektorów słonecznych będzie korzystać ok.2100 os.Ponadto w ramach projektu zostanie zainstalowanych 40 kotłów na biomasę (drewno,pellet,brykiety drzewne,zrębki,odpady drzewne,słoma) na budynkach mieszkalnych oraz 1 kocioł na budynku użyteczn.publ.(Budynek Stowarzyszenia Ewangelizacji i Kultury Siedleckiej w m.Siedlanów)-łączna moc 750 kW (liczba korzystających: 156). Zostanie utworzona podstrona internetowa promująca odnawialne źródła energii - portal ten będzie wdrażał i promował rozwiązania, usługi i produkty czystej energii a także promował gminę jako ośrodek czystej energii na obszarze peryferyjnym. W ramach projektu zostanie także wykonany System TIK,który będzie m.in. zbierać i przechowywać w centralnej bazie danych inform.o instalacjach OZE, produkcji energii w poszczególnych instalacjach, monitorować pracę inst. OZE i w razie konieczności powiadamiać określonych użytkowników systemu o nienormalnych stanach czy przerwach w pracy instalacji, zarządzać instal.(wprowadzanie do systemu nowych urządzeń, wprowadzania zmian ich właściwości itp.), generować raporty dotyczące ilości wyprodukowanej przez określone grupy instalacji (np. wg rodzaju instalacji, lokalizacji) energii w określonych okresach czasu, wizualizować rozmieszczenie instalacji na mapie, z możliwością symbolizacji wg rodzaju, mocy itp. Przedmiotowy projekt jest spójny zgodny z "Programem ochrony powietrza dla strefy lubelskiej", który celem jest poprawa jakości powietrza do poziomów dopuszczalnych i docelowych, mi.in. poprzez ograniczenie emisji z indywidualnych systemów grzewczych poprzez stworzenie i realizację systemu zachęt do ich likwidacji lub wymiany na niskoemisyjne. (Polish)
    0 references
    The aim of the project is to improve the quality of the environment, diversify energy supply and increase energy security. As part of the project, solar collectors (2, 3 and 4 panels) will be installed on the buildings of the inhabitants of Radzyń podl, a total of 532 sets (1470 panels) with a capacity of 1.82133 MW. The solar collectors will be used by about 2100 people.In addition, 40 biomass boilers will be installed as part of the project (wood, pellet, wood chips, wood chips, wood waste, straw) on residential buildings and 1 boilers on the usable building. Publ.(Building of the Association of Evangelisation and Culture in Siedlanów) – a total power of 750 kW (number of users) 156. A sub-page will be created to promote renewable energy sources – the portal will implement and promote clean energy solutions, services and products and promote the municipality as a centre of clean energy in the outermost area. The project will also include the implementation of the ICT system, which will, among others, collect and store in the central database information about RES installations, energy production in individual installations, monitor the operation of inst. RES and, if necessary, notify certain system users of abnormal states or breaks in the installation, manage the installation.(introducing new devices into the system, making changes to their properties, etc.), generate reports on the quantity produced by specific groups of installations (e.g. by type of installation, location) of energy during certain time periods, visualise the location of the installation on the map, with the possibility of symbolisation by type, power, etc. This project is consistent with the ‘Air Protection Programme for the Lublin Zone’, which aims to improve air quality to acceptable and target levels, e.g. by reducing emissions from individual heating systems by creating and implementing a system of incentives to decommission or replace them with low carbon. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0096/16
    0 references