THERMAL MODERNISATION OF THE SEAT OF THE ZGIERZ MUNICIPALITY OFFICE (Q101893): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 10:26, 29 October 2020
Project Q101893 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF THE SEAT OF THE ZGIERZ MUNICIPALITY OFFICE |
Project Q101893 in Poland |
Statements
459,616.55 zloty
0 references
540,725.37 zloty
0 references
85.0 percent
0 references
22 December 2017
0 references
30 December 2018
0 references
GMINA ZGIERZ
0 references
PRZEDMIOT. PROJEKT OBEJMUJE SWOIM ZAKRESEM PRACE TERMOMODERNIZACYJNE W BUDYNKU URZĘDU GMINY W ZGIERZU. BUDYNEK ZLOKALIZOWANY JEST W ZGIERZU WOJ. ŁÓDZKIE , UL. ŁĘCZYCKA 4, DZ. NR 258 J.E. 102003_1, OB. 0122. TEREN PŁASKI, ZABUDOWANY, POSIADA WEJŚCIE ORAZ WJAZD Z DZIAŁKI NR 202/2 (UL. ŁĘCZYCKA). OD STR. ZACH. GRANICZY Z DZ. DROGOWĄ NR 202/2 (UL. ŁĘCZYCKA), OD STR. PÓŁN. Z DZ. O NR 256, OD STRONY WSCH. I POŁD. Z DZ. O NR 260/1. PROJEKT ZOSTAŁ WYBRANY W TRYBIE POZAKONKURSOWYM O STRATEGICZNYM ZNACZENIU DLA SPOŁECZNO-GOSPODARCZEGO OBSZARU ZIT. WSKAZANY W STRATEGII ŁÓDZKIEGO OBSZARU METROPOLITALNEGO 2020+. ZADANIA. PROJEKTEM OBJĘTO DOCIEPLENIE BUDYNKU (POW. UŻ. 789,80 M2) WRAZ Z OTYNKOWANIEM, INSTALACJĘ WENTYLACJI MECHANICZNEJ, WYMINĘ RYNIEN I RUR SPUSTOWYCH, ORAZ WYMIANĘ CZĘŚCI INSTALACJI ELEKTRYCZNEJ OŚWIETLENIA I WYMIANĘ PUNKTÓW OŚWIETLENIOWYCH, WYMIANĘ CZĘŚCI OKIEN WRAZ Z PARAPETAMI WEWNĘTRZNYMI, A TAKŻE WSZYSTKICH PARAPETÓW ZEWNĘTRZNYCH, MONTAŻ OCIEPLENIA KLATKI SCHODOWEJ NA STRYCH WRAZ Z OTYNKOWANIEM, ORAZ OCIEPLENIA STROPU NA STRYCHU, A TAKŻE MONTAŻ SUFITÓW PODWIESZANYCH W WYBRANYCH POMIESZCZENIACH I OBUDOWĘ NOWEJ INSTALACJI PŁYTĄ G-K WRAZ Z OTYNKOWANIEM. W RAMACH WYKONANIA INSTALACJI ELEKTRYCZNEJ W BUDYNKU, PROJEKT OBEJMUJE PRACE W ZAKRESIE: OŚWIETLENIA WBUDOWANEGO W CAŁYM BUDYNKU, MONTAŻU OŚWIETLENIA AWARYJNEGO I EWAKUACYJNEGO KIERUNKOWEGO W CAŁYM BUDYNKU, ZASILANIA URZĄDZEŃ INSTALACJI SANITARNYCH ORAZ INSTALACJĘ ODGROMOWĄ. INWESTYCJA OBEJMIE TAKŻE WYKONANIE WENTYLACJI MECHANICZNEJ DLA PROJEKTOWANEGO ZAMIERZENIA BUDOWLANEGO. CELEM PROJEKTU JEST POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ BUDYNKU POPRZEZ OCIEPLENIE BUDYNKU, WYMIANĘ OKIEN, ORAZ WYK. OŚWIETLENIA ENERGOOSZCZĘDNEGO. ZAKŁADA SIĘ ZWIĘKSZENIE EFEKTYWNOŚCI ENERGETYCZNEJ BUDYNKU POW. 25%, A ROCZNE ZMNIEJSZ. ZAPOTRZEBOWANIA NA ENERGIĘ WYNIESIE 68,65% GRUPY DOCELOWE: UŻYTKOWNIKAMI PROJEKTU BĘDĄ OSOBY KORZYSTAJĄCE Z TERMOMODERNIZOWANEGO OBIEKTU SEKTORA PUBLICZNEGO, W SZCZEGÓLNOŚCI MIESZKAŃCY GMINY ZGIERZ (Polish)
0 references
IT’S AN ITEM. THE PROJECT INCLUDES THERMAL MODERNISATION WORKS IN THE BUILDING OF THE MUNICIPAL OFFICE IN ZGIERZ. THE BUILDING IS LOCATED IN ZGIRZWOJ. LODZ, UL. ŁĘCZYCKA 4, DZ. NO 258 J.E. 102003_1, C. 0122. FLAT, BUILT-UP AREA, HAS AN ENTRANCE AND ENTRANCE FROM PLOT NO. 202/2 (UL. “ŁĘCZYCKA”. FROM THE STR. I'M ZACH. IT BORDERS WITH DZ. ROAD NO 202/2 (UL. LĘCZYCKA), FROM STR. IT’S A HALF. WITH THE DZ. 256 O'CLOCK, EAST SIDE. AND THE LOC. WITH THE DZ. 260/1. THE PROJECT WAS SELECTED IN A NON-COMPETITION PROCEDURE OF STRATEGIC IMPORTANCE FOR THE SOCIO-ECONOMIC AREA OF THE ITI. INDICATED IN THE STRATEGY OF THE ŁÓDŹ METROPOLITAN AREA 2020+. IT’S A TASK. THE PROJECT INCLUDED WARMING OF THE BUILDING (POW. NO, NO, NO. 789,80 M2) INCLUDING PLASTERING, MECHANICAL VENTILATION SYSTEM, DRAIN GUTTERS AND DRAIN PIPES, AS WELL AS REPLACEMENT OF PARTS OF THE ELECTRICAL LIGHTING SYSTEM AND REPLACEMENT OF LIGHTING POINTS, REPLACEMENT OF PARTS OF WINDOWS WITH WINDOW SILLS, AS WELL AS ALL EXTERIOR WINDOW SILLS, INSTALLATION OF STAIRWAY WARMING ON THE ATTIC WITH PLASTERING, AND WARMING OF THE CEILING IN THE ATTIC, AS WELL AS INSTALLATION OF SUSPENDED CEILINGS IN SELECTED ROOMS AND HOUSING OF THE NEW INSTALLATION. AS PART OF THE CONSTRUCTION OF AN ELECTRICAL INSTALLATION IN THE BUILDING, THE PROJECT INCLUDES WORK ON: BUILT-IN LIGHTING THROUGHOUT THE BUILDING, INSTALLATION OF EMERGENCY LIGHTING AND DIRECTIONAL EVACUATION LIGHTING THROUGHOUT THE BUILDING, POWER SUPPLY OF SANITARY INSTALLATIONS AND LIGHTNING SYSTEM. THE INVESTMENT WILL ALSO INCLUDE THE CONSTRUCTION OF MECHANICAL VENTILATION FOR THE DESIGN OF THE CONSTRUCTION PROJECT. THE AIM OF THE PROJECT IS TO IMPROVE THE ENERGY EFFICIENCY OF THE BUILDING BY WARMING THE BUILDING, REPLACING WINDOWS, AND EXECUTING. ENERGY-SAVING LIGHTING. IT IS EXPECTED TO INCREASE THE ENERGY EFFICIENCY OF THE BUILDING. 25 %, AND A YEAR DOWN. ENERGY DEMAND WILL AMOUNT TO 68.65 % OF THE TARGET GROUP: USERS OF THE PROJECT WILL BE USERS OF THE TERMOMODERNED PUBLIC SECTOR FACILITY, IN PARTICULAR RESIDENTS OF THE MUNICIPALITY OF ZGIERZ (English)
17 October 2020
0 references
Identifiers
RPLD.04.02.01-10-0025/17
0 references