“THE CONSTRUCTION OF THE PHOTOVOLTAIC FARM SADYKIERZ” (Q101763): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 10:19, 29 October 2020
Project Q101763 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “THE CONSTRUCTION OF THE PHOTOVOLTAIC FARM SADYKIERZ” |
Project Q101763 in Poland |
Statements
2,234,342.13 zloty
0 references
3,238,177.0 zloty
0 references
69.0 percent
0 references
9 November 2017
0 references
31 December 2019
0 references
WELESS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedsięwzięcie polegać będzie na budowie infrastruktury technicznej , której zadaniem będzie pozyskiwanie energii z OZE jakim jest promieniowanie słoneczne. Farma fotowoltaiczna o docelowej mocy do 0,967 MW zaprojektowana na gruntach ornych w m. Sadykierz, gmina Rzeczyca, powiat tomaszowski, woj. łódzkieUrządzenia, to wolnostojące panele słoneczne wraz z inwerterami, przyłączem elektroenergetycznym oraz stacją transformatorową. Dodatkowymi elementami będą droga techniczna i plac montażowy, ogrodzenie terenu oraz zjazd z drogi.Wytworzona energia elektryczna zostanie w całości wprowadzona do krajowej sieci elektroenergetycznej.Celem głównym projektu jest zwiększenie produkcji energii ze źródeł odnawialnych. Jest on zgodny z poddziałaniem IV.1.2.Osiągnięcie tak opisanego celu przyczyni się do rozwiązania problemów zidentyfikowanych na etapie analizy problemów projektu i pozwoli na zwiększenie bezpieczeństwa energetycznego na obszarze gminy i województwa oraz zmniejszenie negatywnego oddziaływania zanieczyszczeń na życie i zdrowie ludności oraz środowisko.Najszerzej opisaną grupą docelową są wszyscy mieszkańcy RP, będący odbiorcami energii elektrycznej lub jej efektu.Projekt składa się z 4 zadań:Przygotowanie dokumentacji inwestycyjnej.Budowa i odbiór instalacji fotowoltaicznej.Promocja i zarządzanie projektem.Budowa sieci niskiego napięcia - przyłącze do KSE.Projekt jest zgodny z polityką promowania równości mężczyzn i kobiet oraz niedyskryminacji.W trakcie realizacji i po wdrożeniu kobietom i mężczyznom przypisywana będzie taka samą wartość społeczna, równe prawa, obowiązki, dostęp do zasobów. W czasie wyboru dostawców i rekrutacji firma będzie kierować się wyłącznie kompetencjami i umiejętnościami oferentów i kandydatów. Wszystkie osoby związane z projektem będą wynagradzani na podstawie osiąganych efektów. Spółka będzie przestrzegała zasady równouprawnienia kobiet i mężczyzn w tym w zakresie propagowania godzenia pracy i życia osobistego. (Polish)
0 references
The project will consist of the construction of technical infrastructure whose task will be to obtain energy from RES, i.e. solar radiation. Photovoltaic farm with target power up to 0.967 MW designed on arable land in Sadykierz, commune Rzeczyca, district tomaszowski, Łódź VoivodeshipThe devices are free-standing solar panels with inverters, power connection and transformer station. Additional elements will be the technical road and assembly site, fence and exit off the road.The generated electricity will be fully integrated into the national electricity grid.The main objective of the project is to increase the production of renewable energy sources. It is in line with sub-measure IV.1.2.According to this objective, it will help to solve the problems identified at the stage of the project analysis and will allow to increase energy security in the area of the municipality and the voivodship and to reduce the negative impact of pollution on the life and health of the population and the environment.The most widely described target group are all residents of the Republic of Poland, being the recipients of the electricity energy or its effect.The project consists of 4 tasks:Preparation of investment documentation.Construction and reception of photovoltaic installations will be equal to the value of women’s electricity, or its effect.The project consists of 4 tasks:Preparation of investment documentation.Construction and reception of photovoltaic installations.The project is equal to women’s social documentation.Construction and reception of photovoltaic installations.According to sub-measure IV.1.2.According to this objective, it will help to solve the problems identified during the analysis of the project and will increase energy security in the area of the municipality and voivodship and reduce the negative impact of pollution on the life and health of the population and the environment.The most widely described target are all the inhabitants of the Republic of Poland, being the recipients of electricity and its effect.The project consists of 4 tasks:Project is equal to the preparation of investment documentation.Construction and reception of the photovoltaic installation.The project is equal to women’s social documentation.Construction and reception of photovoltaic installations.Project for women’s equal to the cost of Equality of Men.Construction and reception of photovoltaic installations.Promotion of the project and the reception of photovoltaic installations.According to sub-measure IV.1.2.The achievement of this objective will help solve the problems identified at the stage of the analysis of the project and will allow to increase energy security in the area of the municipality and voivodship and reduce the negative impact of pollution on the life and health of the population and the environment.The most widely described target are all the inhabitants of the Republic of Poland, which are recipients of electricity or its effect.There is equal access to women’s rights.There is equal to the implementation of women’s social documentation.Construction and reception of photovoltaic installations.The project is equal to the implementation of the social documentation.Construction and reception At the time of the selection of suppliers and recruitment, the company will be guided solely by the competences and skills of bidders and candidates. All persons associated with the project will be remunerated on the basis of the results achieved. The Company will respect the principle of equality between men and women in the area of promoting reconciliation of work and personal life. (English)
17 October 2020
0 references
Identifiers
RPLD.04.01.02-10-0063/16
0 references