Modernisation of the Structure of St. Marsa – Soldiers’ Node Marsa – the border of the city – stage II (Q85834): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 06:49, 29 October 2020

Project Q85834 in Poland
Language Label Description Also known as
English
Modernisation of the Structure of St. Marsa – Soldiers’ Node Marsa – the border of the city – stage II
Project Q85834 in Poland

    Statements

    0 references
    156,063,345.0 zloty
    0 references
    37,455,202.8 Euro
    13 January 2020
    0 references
    183,603,935.3 zloty
    0 references
    44,064,944.47 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 March 2020
    0 references
    MIASTO STOŁECZNE WARSZAWA
    0 references
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Projekt polega na modernizacji ciągu ulic Marsa – Żołnierska, na odcinku od węzła Marsa (ul. Naddnieprzańska) do granicy miasta. Ulice te leżą w ciągu drogi wojewódzkiej nr 631 w granicach Warszawy. Na całym modernizowanym odcinku ul. Marsa tj. od ul. Naddnieprzańskiej do skrzyżowania z ulicami: Żołnierską i Rekrucką zaprojektowano 4 jezdnie dwupasmowe: 2 jezdnie główne (gł. ruchu przysp. GP) dla ruchu tranzytowego i 2 jezdnie zbierająco-rozprowadzające prowadzące ruch lokalny do skrzyżowań z ul.: Chełmżyńską – Okularową i Żołnierską – Rekrucką. Inwestor wykona następujące obiekty drogowe i inżynieryjne: • wiadukt w ciągu ul. Marsa nad torami kolejowymi, estakadę nad skrzyżowaniem ulic Marsa–Okularowa–Chełmżyńska i Marsa–Żołnierska – Czwartaków, • kładkę dla pieszych i rowerzystów nad ul. Żołnierską w rejonie parkingu, • wiadukt w ciągu ul. Żołnierskiej nad torami kolejowymi, • wiadukt w ciągu ul. Żołnierskiej nad skrzyzowniem z ulica Czwartaków, mury oporowe oraz ekrany akustyczne, urządzenia odprowadzające i oczyszczające spływy powierzchni dróg, przepusty dla zwierząt i wygrodzenia drogi na odcinku leśnym, nowe nasadzenia roślinne, chodniki, ścieżki rowerowe, ciągi pieszo-rowerowe, itp (Polish)
    0 references
    The project consists of modernisation of Marsa – Soldierska Streets, on the section from Mars junction (ul. Transnistria) to the border of the city. These streets are located within the Voivodeship Road No. 631 within the limits of Warsaw. All over the modernised section of the street. Mars, i.e. from St. Nadnieprzańska to the intersection with the streets: The Soldiers and Recructs were designed for 4 two-lane roads: 2 main roads (head traffic). GP) for transit traffic and 2 collecting and distributing roads leading local traffic to intersections with ul.: Chełmżyńska – spectacle and soldier – Rekrucka. The investor will perform the following road and engineering facilities: • viaduct within ul. Marsa above the railway tracks, overpass over the intersection of Marsa-ocularowa-Chełmżyńska and Marsa-Zołnierska – Czwartaków streets, • pedestrian and cyclists footbridge over St. Soldiers in the area of the parking lot, • viaduct within ul. Soldiers over railway tracks, • viaduct within ul. Soldiers above the crossroads from Czwartaków Street, resistance walls and acoustic screens, drainage and cleansing equipment for road surfaces, animal culverts and road fences in the forest section, new plantings, pavements, bicycle paths, walking and cycling tracks, etc. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.03.01.00-00-0013/15
    0 references