Restoration of the ecological continuity of the Vistula and the lower sections of the Soła and Skawa rivers (Q85039): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Poland | Project Q85039 in Poland | ||
description / pl | description / pl | ||
Projekt w Polsce | Projekt Q85039 w Polsce |
Revision as of 06:46, 29 October 2020
Project Q85039 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Restoration of the ecological continuity of the Vistula and the lower sections of the Soła and Skawa rivers |
Project Q85039 in Poland |
Statements
37,672,284.99 zloty
0 references
44,320,335.29 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE - REGIONALNY ZARZĄD GOSPODARKI WODNEJ W KRAKOWIE
0 references
Celem realizacji projektu jest poprawa stanu ekologicznego wód odcinków rzek Wisły, Soły i Skawy. w ramach projektu zostanie przywrócona spójność sieci obszarów Natura 2000 oraz odtworzone zostaną historyczne korytarze ekologiczne łączące Wisłę z rzekami Sołą i Skawą. Strategiczny cel projektu zostanie osiągnięty w wyniku realizacji głównego działania inwestycyjnego projektu obejmującego udrożnienie 9 barier hydrotechnicznych zlokalizowanych na odcinku rzeki Wisły pomiędzy ujściem Soły i Skawy, odcinku Skawy od zapory Świnna Poręba do jej ujścia oraz na odcinku Soły od zapory w Czańcu do ujścia. (Polish)
0 references
The aim of the project is to improve the ecological status of the river sections of the Vistula, Soła and Skawa rivers. The project will restore the coherence of the Natura 2000 network and restore the historical ecological corridors connecting the Vistula with the Soła and Skawa rivers. The strategic objective of the project will be achieved as a result of the implementation of the main investment activity of the project including the clearance of 9 hydrotechnical barriers located on the Vistula river section between the mouth of Soła and Skawa, a section of Skawa from the Świnna Poręba barrier to its estuary and at the section of the Soła River from the dam in Chaniec to the mouth. (English)
14 October 2020
0 references
Identifiers
POIS.02.01.00-00-0002/19
0 references