Construction of the second metro line, together with accompanying infrastructure and purchase of rolling stock – stage II (Q86049): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 06:36, 29 October 2020
Project Q86049 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the second metro line, together with accompanying infrastructure and purchase of rolling stock – stage II |
Project Q86049 in Poland |
Statements
1,826,345,155.08 zloty
0 references
2,435,126,873.45 zloty
0 references
75.0 percent
0 references
1 January 2014
0 references
30 June 2023
0 references
MIASTO STOŁECZNE WARSZAWA
0 references
Projekt zlokalizowany jest na terenie m.st. W-wy, woj. mazowieckie w dzielnicach: Wola (odc. zach.), Praga Północ, Targówek (odc. wschodni-północny), Ursynów (Stacja Techniczno Postojowa Kabaty „STP Kabaty”). Na Projekt składają się: Podprojekt A – rozbudowa odc. centralnego II linii metra o 3 stacje w kier. zachodnim i 3 stacje w kier. wschodnim - północnym, budowa obiektów na terenie STP Kabaty w W-wie, prace przygotowawcze dla etapu III budowy II linii, Podprojekt B – zakup 13 szt. taboru. W ramach odcinka zachodniego wykonane zostaną: -3 stacje: C8, C7, C6, -3 wentylatornie szlakowe: V9, V8, V7, -3 tunele szlakowe: D9, D8, D7, -komora demontażowa za stacją C9 „Rondo Daszyńskiego” W ramach odcinka wschodniego-północnego zachodniego wykonane zostaną: -3 stacje: C16, C17, C18, -3 wentylatornie szlakowe: V16, V17, V18, -3 tunele szlakowych: D16, D17, D18, -komora demontażowa w komorze torów odstawczych za stacją C15 „Dworzec Wileński”. Na terenie STP Kabaty zostaną wybudowane (1 pozwolenie na budowę): -obiekt nr 6 – hala postojowa z 14 miejscami przeglądowo – naprawczymi dla taboru, gdzie będzie przechowywany nowo zakupiony tabor; -obiekt nr 13a - magazyn materiałów chemicznych; -obiekt liniowy w zakresie układu torowego wraz z drogami wewnętrznymi. Zostaną wykonane prace przygotowawcze dla etapu III bud. II linii – część prac. Zakupiony zostanie tabor – 13 szt. do obsługi I i II linii metra, części zamienne, stanowiska, narzędzia i oprogramowanie do obsługi, serwisu i diagnostyki pociągów. Powstała infrastruktura pozwoli na utworzenie nowego połączenia komunikacji miejskiej, w miejscach generujących potoki ruchu. Nowe stacje metra zapewnią integrację kilku rodzajów środków transportu. Właścicielem infrastruktury będzie m.st. W-wa, a taboru MW Sp. z o.o. Właściciele majątku powstałego w projekcie są gwarantem trwałości projektu. Projekt nie zostanie poddany znaczącym modyfikacjom w rozumieniu art. 71 Rozp. Parlamentu Europ. i Rady UE. (Polish)
0 references
The project is located in the area of W-wy, Mazowieckie Voivodeship in districts: Wola (e.g. zach.), Prague Północ, Targówek (East-North), Ursynów (Kabaty Technical Station “STP Kabaty”). The Project consists of: Sub-project A – extension of central II metro line by 3 stations in western direction and 3 stations in eastern – northern direction, construction of facilities in the area of the Kabata STP in W-wa, preparatory work for stage III construction of line II, Subproject B – purchase of 13 units of rolling stock. Within the western section, the following will be carried out: —3 stations: C8, C7, C6, -3 trail fans: V9, V8, V7, -3 tunnels: D9, D8, D7, -disassembly chamber behind station C9 “Rondo Daszyński” As part of the eastern-northwest section, the following will be performed: —3 stations: C16, C17, C18, -3 trail fans: V16, V17, V18, -3 tunnels: D16, D17, D18, – disassembly chamber in the stairway chamber behind station C15 “Wilenski Railway Station”. In the area of STP Kabata will be built (1 building permits): —object 6 – parking hall with 14 maintenance and repair places for rolling stock, where the newly purchased rolling stock will be stored; —object No 13a – storage of chemical materials; —linear object in the range of track system with internal roads. Preparatory work for Stage III will be carried out. The Second Line – Part of the Works. Rolling stock will be purchased – 13 units for operation of subway lines I and II, spare parts, workstations, tools and software for operation, service and diagnostics of trains. The infrastructure will allow for the creation of a new connection of public transport, in places that generate traffic flows. The new metro stations will ensure the integration of several modes of transport. The infrastructure will be owned by W-wa and MW Sp. z o.o. The owners of the property created in the project guarantee the sustainability of the project. The project will not undergo significant modifications within the meaning of Article 71. The European Parliament and the Council of the EU. (English)
14 October 2020
0 references
Identifiers
POIS.06.01.00-00-0001/16
0 references
4142