Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna (Q85957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 05:42, 29 October 2020

Project Q85957 in Poland
Language Label Description Also known as
English
Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna
Project Q85957 in Poland

    Statements

    0 references
    775,677,722.67 zloty
    0 references
    186,162,653.44 Euro
    13 January 2020
    0 references
    912,562,026.68 zloty
    0 references
    219,014,886.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2023
    0 references
    GMINA MIASTO ŚWINOUJŚCIE
    0 references
    0 references

    53°49'37.2"N, 14°20'8.5"E
    0 references
    Zakłada się wykonanie tunelu jednonawowego w technologii tarczy drążonej TBM, dł. 1,44 km. Pozostałymi elementami układu drogowego będą: drogi dojazdowe do tunelu: wyspa Uznam drogi dojazdowe do tunelu wraz ze stacją poboru opłat, wyspa Wolin drogi dojazdowe do tunelu oraz rondo. (Polish)
    0 references
    A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.04.02.00-00-0021/16
    0 references