Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy (Q84414): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 05:21, 29 October 2020
Project Q84414 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy |
Project Q84414 in Poland |
Statements
16,448,895.5 zloty
0 references
26,300,000.0 zloty
0 references
62.54 percent
0 references
22 March 2019
0 references
30 September 2021
0 references
ENEA OPERATOR SP. Z O.O.
0 references
Celem projektu jest zwiększenie możliwości przyłączenia źródeł wytwarzania energii elektrycznej OZE bez jednoczesnego obniżania parametrów dostarczanej energii oraz przy minimalizowaniu ryzyka wystąpienia awarii i przerw w dostawie energii (zniesione zostaną istotne bariery dla rozwoju energetyki odnawialnej). W wyniku realizacji projektu zwiększy się możliwość przyłączenia wytwórców energii elektrycznej z OZE. Ponadto, poprawie ulegną warunki zasilania odbiorców objętych zasięgiem oddziaływania stacji. Cel bezpośredni, a tym samym projekt, jest zgodny z celami Programu Operacyjnego, osi priorytetowej oraz działania i poddziałania 1.1.2 POIiŚ. Projekt obejmuje swoim zakresem budowę nowej stacji elektroenergetycznej GPZ Skwierzyna II 110/15 kV składającej się z rozdzielni 110 kV i rozdzielnicy 15 kV. Stacja stanowi element sieci dystrybucyjnej na napięciu 110 kV, na której odbywa się transformacja energii elektrycznej na napięcie 15 kV wraz z linią zasilającą 110 kV oraz wyprowadzeniami 15 kV. (Polish)
0 references
The aim of the project is to increase the possibility of connecting sources of RES electricity generation without simultaneously reducing the parameters of the supplied energy and minimising the risk of failures and interruptions in the supply of energy (relevant barriers to the development of renewable energy will be removed). As a result of the project, the possibility of connecting electricity generators from RES will be increased. In addition, the conditions for powering those affected by the station will be improved. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures 1.1.2 of the OP. The project covers the construction of a new power station GPZ Skwierzyna II 110/15 kV consisting of a 110 kV switchgear and a 15 kV switchgear. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV with a supply line of 110 kV and outputs of 15 kV. (English)
14 October 2020
0 references
Identifiers
POIS.01.01.02-00-0003/19
0 references