Building modifications of apartment buildings HARMONIE I and II, Rybářská no. 1810, 1819 Insulated insulation of the perimeter and roof coat (Q75691): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 03:33, 29 October 2020

Project Q75691 in Czech Republic
Language Label Description Also known as
English
Building modifications of apartment buildings HARMONIE I and II, Rybářská no. 1810, 1819 Insulated insulation of the perimeter and roof coat
Project Q75691 in Czech Republic

    Statements

    0 references
    5,866,196.1 Czech koruna
    0 references
    234,647.84 Euro
    10 January 2020
    0 references
    19,553,987.0 Czech koruna
    0 references
    782,159.48 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    12 July 2017
    0 references
    30 September 2018
    0 references
    MĚSTO NÁCHOD
    0 references
    0 references

    50°23'25.8"N, 16°11'34.1"E
    0 references
    54701
    0 references
    Cílem projektu je snížení energetické náročnosti dvou bytových domů HARMONIE I. a II. zateplením obálek budova a dosažením úspory celkové dodané energie v minimální výši 30 % oproti stavu před realizací opatření, dosažení klasifikační třídy celkové dodané energie C nebo lepší a zároveň splnění požadavků pro nákladově optimální úroveň podle písm. a) nebo b), odst. 2, §6, vyhlášky č. 78/2013 Sb., o energetické náročnosti budov. (Czech)
    0 references
    The aim of the project is to reduce the energy performance of two housing houses HARMONIE I. and II. by insulated envelopes the building and achieving a savings of total energy delivered at a minimum of 30 % compared to the situation prior to the implementation of the measure, achieving the classification class of the total energy supplied C or better and at the same time fulfilling the requirements for cost-optimal level according to letter (a) or b), paragraph 2, §6, Decree No. 78/2013 Coll., on the energy performance of buildings. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0004825
    0 references