Road I/11 Nebory – Oldřichovice – Bystrice (2nd phase) (Q72441): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 03:26, 29 October 2020

Project Q72441 in Czech Republic
Language Label Description Also known as
English
Road I/11 Nebory – Oldřichovice – Bystrice (2nd phase)
Project Q72441 in Czech Republic

    Statements

    0 references
    0 references
    1,825,092,046.05 Czech koruna
    0 references
    73,003,681.84 Euro
    10 January 2020
    0 references
    2,232,277,930.0 Czech koruna
    0 references
    89,291,117.2 Euro
    10 January 2020
    0 references
    81.76 percent
    0 references
    1 January 2016
    0 references
    30 November 2019
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/11 v kategorii S 24,5/100 v celk. délce hl. trasy 11,099 km (stavba I/11 Nebory - Oldřichovice 4,860 km a stavba I/11 Oldřichovice - Bystřice 6,239 km), o dvou jízdních pruzích v každém směru a mimoúrovňovým napojením křižujících komunikací. Nově budovaná silnice I/11 v úseku Nebory - Oldřichovice - Bystřice je součástí definitivního řešení propojení dálnice D48 se Slovenskou republikou a VI. Evropského dopravního koridoru po silnici I/68 a I/11. (Czech)
    0 references
    The object of the project is the construction of the relocation of road I/11 in category S 24,5/100 in the total length of the main route 11.099 km (construction I/11 Nebory – Oldřichovice 4.860 km and construction I/11 Oldřichovice – Bystřice 6.239 km), with two lanes in each direction and an off-level connection of roads. The newly built road I/11 in the section Nebory – Oldřichovice – Bystřice is part of the definitive solution for connecting the D48 motorway with the Slovak Republic and VI. European transport corridor by road I/68 and I/11. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/16_007/0000047
    0 references