Acquisition of electric buses for the town of Bílina (Q74669): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 02:58, 29 October 2020

Project Q74669 in Czech Republic
Language Label Description Also known as
English
Acquisition of electric buses for the town of Bílina
Project Q74669 in Czech Republic

    Statements

    0 references
    0 references
    30,680,750.0 Czech koruna
    0 references
    1,227,230.0 Euro
    10 January 2020
    0 references
    36,095,000.0 Czech koruna
    0 references
    1,443,800.0 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    17 October 2017
    0 references
    31 August 2018
    0 references
    31 August 2018
    0 references
    ARRIVA CITY s.r.o.
    0 references
    0 references

    50°5'1.93"N, 14°30'28.48"E
    0 references
    10800
    0 references
    Obsahem projektu je pořízení 3 kusů nízkopodlažních bateriových autobusů náhradou za stávající nevyhovující dieselové vozy.Cílem je snížit emise produkované vozidly MHD v Bílině a zlepšit základní dopravní obslužnost v rámci závazku veřejné služby.Projekt je jednoetapový a zahrnuje 1 hlavní aktivitu a 2 vedlejší.Projekt je svým charakterem jednoduchý (nákup vozidel). Díky tomu není projekt rizikový.Jeho výstupem jsou pořízená vozidla a snížené emise. Počet přepravených osob se nemění. (Czech)
    0 references
    The project includes the acquisition of 3 units of low-floor battery buses as a replacement for existing non-compliant diesel cars.The aim is to reduce emissions produced by public transport vehicles in Bílina and improve the basic transport serviceability under the public service obligation.The project is single stage and includes 1 main activity and 2 secondary activities.The project is simple (buying vehicles). Thanks to this, the project is not a risky project.Its outputs are purchased vehicles and reduced emissions. The number of passengers carried does not change. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.1.37/0.0/0.0/16_045/0006640
    0 references