Group water supply Hořicko (Q61292): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 00:04, 29 October 2020

Project Q61292 in Czech Republic
Language Label Description Also known as
English
Group water supply Hořicko
Project Q61292 in Czech Republic

    Statements

    0 references
    26,358,119.4 Czech koruna
    0 references
    1,054,324.78 Euro
    10 January 2020
    0 references
    41,346,069.65 Czech koruna
    0 references
    1,653,842.79 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 September 2021
    0 references
    Vodohospodářská a obchodní společnost, a.s.
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Projekt obsahuje výstavbu dvou přivaděčů a čerpací stanice v ÚV Březovice v oblasti Hořicka a jeho cílem je nalézt řešení pro zajištění dodávky kvalitní pitné vody v odpovídajícím množství. První přivaděč směřuje do skupinového vodovodu Boháňka - ze stávající úpravny v obci Březovice do stávajícího vodojemu v prameništi Na Bahnech, druhý přivaděč je trasován z obce Boháňka do stávajícího vodojemu v obci Doubrava. Celková délka navrženého vodovodu je 8041,5 m. (Czech)
    0 references
    The project includes the construction of two feeders and a petrol station in ÚV Březovice in the area of Hořicka and its aim is to find a solution for ensuring the supply of quality drinking water in the corresponding quantity. The first entrance goes to the group water supply Boháňka – from the existing treatment plant in the village Březovice to the existing water tower in the spring Na Bahnech, the second entrance is routed from the village of Boháňka to the existing water tower in the village Doubrava. The total length of the proposed water supply is 8041.5 m. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007119
    0 references