Energy savings Cvinger bus (Q16445): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 17:56, 28 October 2020

Project Q16445 in Czech Republic
Language Label Description Also known as
English
Energy savings Cvinger bus
Project Q16445 in Czech Republic

    Statements

    0 references
    3,369,751.46 Czech koruna
    0 references
    134,790.06 Euro
    10 January 2020
    0 references
    6,739,502.92 Czech koruna
    0 references
    269,580.12 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    30 June 2020
    0 references
    Cvinger bus s.r.o.
    0 references
    0 references

    50°19'40.19"N, 12°43'15.92"E
    0 references
    36221
    0 references
    Cílem projektu je rekonstrukce administrativní budovy, na adrese Kraslická č.p.250, 362 21 Nejdek, p.č. 376, k.ú. Nejdek (702625) a snížení její energetické náročnosti. Žadatel zakoupil nemovitost v dražbě od původních majitelů v zanedbaném stavu. Objekt je využíván pro administrativu se sociálním zázemím. Zlepšením tepelně technických vlastností obálky budovy, střechy a výplně otvorů; rekonstrukcí systému vytápění a osvětlení dojde ke zprovoznění budovy v požadovaném energetickém standardu. a. (Czech)
    0 references
    The aim of the project is to reconstruct the administrative building at Kraslická č.p.250, 362 21 Nejdek, p.č. 376, k.ú. Nejdek (702625) and the reduction of its energy performance. The applicant purchased the property at auction from the original owners in a neglected state. The building is used for administration with social background. Improving the thermally technical properties of the building envelope, the roof and the filling of the openings; the reconstruction of the heating and lighting system will bring the building into operation in the required energy standard. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013800
    0 references