Impexta ČRO, s.r.o. – Energy savings (Q16398): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. Th...) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Czech Republic | Project Q16398 in Czech Republic | ||
description / cs | description / cs | ||
Projekt v | Projekt Q16398 v Czechia |
Revision as of 17:55, 28 October 2020
Project Q16398 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Impexta ČRO, s.r.o. – Energy savings |
Project Q16398 in Czech Republic |
Statements
1,075,000.0 Czech koruna
0 references
2,150,000.0 Czech koruna
0 references
50 percent
0 references
30 November 2020
0 references
IMPEXTA ČRO s. r. o.
0 references
10400
0 references
Předmětem projektu jsou stavební úpravy haly, kterou pro svou činnost využívá společnost Impexta ČRO, s.r.o.. Stávající objekt bude zateplen, bude vyměněna část otvorových výplní, rovněž dojde k zateplení střechy. Realizací projektu se docílí úspory energie ve výši 263,5 GJ, což představuje úsporu 25 % oproti stávajícímu stavu. Díky tomu dojde ke snížení provozních nákladů o 95 555 Kč. Realizací projektu rovněž dojde ke snížení emisí CO2, a to o 19,149 t/rok. a. (Czech)
0 references
The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. The implementation of the project will also reduce CO2 emissions by 19.149 t/year. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0013666
0 references