Installation of photovoltaic power plant with battery system and necessary modifications of electrical distributions in ZOD Tísek (Q16698): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 17:17, 28 October 2020
Project Q16698 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of photovoltaic power plant with battery system and necessary modifications of electrical distributions in ZOD Tísek |
Project Q16698 in Czech Republic |
Statements
1,938,418.4 Czech koruna
0 references
2,423,023.0 Czech koruna
0 references
80 percent
0 references
30 June 2020
0 references
Zemědělské obchodní družstvo Tísek
0 references
74301
0 references
Instalace fotovoltaické elektrárny o výkonu 50 kWp na střeše správního objektu ZOD Tísek a současně na střeše dílen s bateriovým systémem o výkonu 28 kWh k akumulaci vyrobené elektřiny umístěném v podkroví správního objektu a nezbytnými úpravami elektrorozvodů ve správní budově - dílny, posklizňové lince a úpravy páteřního rozvodu elektřiny v areálu ZOD Tísek s cílem rozvodu vyrobené energie z FVE a akumulované v bateriích po podnikatelském areálu ZOD Tísek a. (Czech)
0 references
Installation of a photovoltaic power plant with an output of 50 kWp on the roof of the administrative building ZOD Tísek and simultaneously on the roof of the workshops with a battery system of 28 kWh for the accumulation of electricity produced in the attic of the administrative building and necessary modifications of electrical distribution in the administrative building – workshops, post-harvest line and modifications of the backbone distribution of electricity in the area of ZOD Tísek with the aim of distribution of produced energy from FVE and accumulated in the business area. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_138/0011722
0 references