Reduction of energy performance of the production area of BOPAL – window and door accessories, s.r.o. (Q15416): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 17:05, 28 October 2020

Project Q15416 in Czech Republic
Language Label Description Also known as
English
Reduction of energy performance of the production area of BOPAL – window and door accessories, s.r.o.
Project Q15416 in Czech Republic

    Statements

    0 references
    5,224,379.64 Czech koruna
    0 references
    208,975.19 Euro
    10 January 2020
    0 references
    13,060,949.12 Czech koruna
    0 references
    522,437.96 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    22 October 2015
    0 references
    31 March 2018
    0 references
    22 June 2018
    0 references
    Bopal Czech s.r.o.
    0 references
    0 references

    49°33'28.30"N, 16°34'48.76"E
    0 references
    67961
    0 references
    V rámci projektu dojde ke zlepšení tepelně technických vlastností budovy v areálu společnosti - bude zateplena obálka budovy, část střechy a budou vyměněny některé otvorové výplně. Dále v rámci projektu proběhne výměna zdroje tepla - bude instalováno tepelné čerpadlo, které bude budovu vytápět a v souvislosti s tím bude přebudován i otopný systém. V budově proběhne v rámci projektu také modernizace osvětlení. V poslední řadě bude instalována FVE. a. (Czech)
    0 references
    The project will improve the thermally technical characteristics of the building on the premises of the company – the envelope of the building, part of the roof will be insulated and some opening fillings will be replaced. The project will also include an exchange of heat source – a heat pump will be installed to heat the building and the heating system will be rebuilt in connection with this. The building will also undergo modernisation of lighting as part of the project. In the last row will be installed FVE. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0000632
    0 references