Energy savings within the framework of the reconstruction of the operating building of CEPS, a.s. (Q15878): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 16:59, 28 October 2020

Project Q15878 in Czech Republic
Language Label Description Also known as
English
Energy savings within the framework of the reconstruction of the operating building of CEPS, a.s.
Project Q15878 in Czech Republic

    Statements

    0 references
    2,388,818.5 Czech koruna
    0 references
    95,552.74 Euro
    10 January 2020
    0 references
    4,777,637.11 Czech koruna
    0 references
    191,105.48 Euro
    10 January 2020
    0 references
    50.0 percent
    0 references
    30 April 2020
    0 references
    CEPS a.s.
    0 references
    0 references

    49°58'5.20"N, 14°32'56.36"E
    0 references

    49°58'14.12"N, 14°31'52.07"E
    0 references
    25242
    0 references
    Projekt je zaměřen na zateplení objektu a rekonstrukci systému vytápění i přípravy TUV v provozní budově technické základny společnosti CEPS a.s. v Cítolibech, která je dlouhodobě využívána jako provozní budova. Stav objektu neodpovídá stávajícím požadavkům na zajištění kvalitního prostředí pro zaměstnance firmy, zároveň spotřeba energií je neúměrně vysoká. Realizace předkládaného projektu přinese úsporu spotřeby energie na vytápění a elektrické energie na chod objektu. a. (Czech)
    0 references
    The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of the submitted project will save energy consumption for heating and electricity on the operation of the building. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011008
    0 references