‘Investigation of the allee a cross, Olešná’ (Q68415): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the renewal and the regeneration of the cross border, with a cross in the cadastral district of the region. Olešná u Havlíčkova Bgenus. As part of the implementation of the action, the treatment of existing tree species and the planting of new tree seedlings, including aftercare, will be carried out. The planned removal of 3 timber trees is also part of the project. In total 106 trees will be treated and 10 trees...)
(‎Created claim: summary (P836): The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is...)
Property / summary
 
The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English)
Property / summary: The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English) / rank
 
Normal rank
Property / summary: The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English) / qualifier
 
point in time: 24 October 2020
Timestamp+2020-10-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:16, 24 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
‘Investigation of the allee a cross, Olešná’
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    293,197.68 Czech koruna
    0 references
    11,727.91 Euro
    10 January 2020
    0 references
    366,497.1 Czech koruna
    0 references
    14,659.88 Euro
    10 January 2020
    0 references
    80 percent
    0 references
    26 September 2016
    0 references
    30 September 2020
    0 references
    Obec Olešná
    0 references
    0 references

    49°36'29.34"N, 15°34'9.91"E
    0 references
    58001
    0 references
    Předmětem projektu je obnovení a regenerace oboustranné aleje U Křížku v k.ú. Olešná u Havlíčkova Brodu. V rámci realizace akce bude provedeno ošetření stávajících dřevin a dosadba nových stromů včetně následné péče. Součástí projektu je i plánované odstranění 3 ks dřevin. Celkem bude ošetřeno 106 ks stromů a k výsadbě je navrženo 10 stromů. Celková délka regenerované aleje je ca 800 m. (Czech)
    0 references
    The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English)
    24 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/15_012/0000065
    0 references