‘Investigation of the allee a cross, Olešná’ (Q68415): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the project is the renewal and the regeneration of the cross border, with a cross in the cadastral district of the region. Olešná u Havlíčkova Bgenus. As part of the implementation of the action, the treatment of existing tree species and the planting of new tree seedlings, including aftercare, will be carried out. The planned removal of 3 timber trees is also part of the project. In total 106 trees will be treated and 10 trees...) |
(Created claim: summary (P836): The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English) | |||||||||||||||
Property / summary: The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English) / qualifier | |||||||||||||||
point in time: 24 October 2020
|
Revision as of 09:16, 24 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ‘Investigation of the allee a cross, Olešná’ |
Project in Czech Republic financed by DG Regio |
Statements
293,197.68 Czech koruna
0 references
366,497.1 Czech koruna
0 references
80 percent
0 references
26 September 2016
0 references
30 September 2020
0 references
Obec Olešná
0 references
58001
0 references
Předmětem projektu je obnovení a regenerace oboustranné aleje U Křížku v k.ú. Olešná u Havlíčkova Brodu. V rámci realizace akce bude provedeno ošetření stávajících dřevin a dosadba nových stromů včetně následné péče. Součástí projektu je i plánované odstranění 3 ks dřevin. Celkem bude ošetřeno 106 ks stromů a k výsadbě je navrženo 10 stromů. Celková délka regenerované aleje je ca 800 m. (Czech)
0 references
The object of the project is the renewal and regeneration of the two-sided avenue U Křížku v k.ú. Olešná near Havlíček Brod. As part of the implementation of the event, treatment of existing trees and planting of new trees, including subsequent care, will be carried out. Part of the project is the planned removal of 3 trees. A total of 106 trees will be treated and 10 trees are designed for planting. The total length of the regenerated avenue is about 800 m. (English)
24 October 2020
0 references
Identifiers
CZ.05.4.27/0.0/0.0/15_012/0000065
0 references