Construction work for multi-family buildings in harmony I and II, Rybářská č. 1810, 1819 insulation of the building envelope and roof envelope (Q75691): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No...)
Property / summary
The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No 78/2013 on the energy performance of buildings. (English)
 
Property / summary: The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No 78/2013 on the energy performance of buildings. (English) / rank
Normal rank
 

Revision as of 22:58, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction work for multi-family buildings in harmony I and II, Rybářská č. 1810, 1819 insulation of the building envelope and roof envelope
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,866,196.1 Czech koruna
    0 references
    234,647.84 Euro
    10 January 2020
    0 references
    19,553,987.0 Czech koruna
    0 references
    782,159.48 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    12 July 2017
    0 references
    30 September 2018
    0 references
    MĚSTO NÁCHOD
    0 references
    0 references

    50°23'25.8"N, 16°11'34.1"E
    0 references
    54701
    0 references
    Cílem projektu je snížení energetické náročnosti dvou bytových domů HARMONIE I. a II. zateplením obálek budova a dosažením úspory celkové dodané energie v minimální výši 30 % oproti stavu před realizací opatření, dosažení klasifikační třídy celkové dodané energie C nebo lepší a zároveň splnění požadavků pro nákladově optimální úroveň podle písm. a) nebo b), odst. 2, §6, vyhlášky č. 78/2013 Sb., o energetické náročnosti budov. (Czech)
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0004825
    0 references