Insulation of housing House ul. Ditches st.38 in Hoastni (Q76428): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the construction of the building of an apartment building in ul. Ditches in Hoasti 38 to reduce the energy intensity of the object. The insulation of the building walls, including the skirting board, is proposed to reduce the energy efficiency of the building. In addition, overall reconstruction and insulation will be carried out and an exchange of original windows and balcony doors will be carried out for new pla...)
(‎Created claim: summary (P836): The object of the project is the construction of the building of the apartment building in ul. Ditches 38 in Hostouni, in order to reduce the energy performance of the object. To reduce the energy intensity of the building is designed to insulate the perimeter walls, including the plinth. In addition, a complete reconstruction of loggias and their insulation will be carried out and the original windows and balcony doors will be replaced with new...)
Property / summary
 
The object of the project is the construction of the building of the apartment building in ul. Ditches 38 in Hostouni, in order to reduce the energy performance of the object. To reduce the energy intensity of the building is designed to insulate the perimeter walls, including the plinth. In addition, a complete reconstruction of loggias and their insulation will be carried out and the original windows and balcony doors will be replaced with new plastic doors. (English)
Property / summary: The object of the project is the construction of the building of the apartment building in ul. Ditches 38 in Hostouni, in order to reduce the energy performance of the object. To reduce the energy intensity of the building is designed to insulate the perimeter walls, including the plinth. In addition, a complete reconstruction of loggias and their insulation will be carried out and the original windows and balcony doors will be replaced with new plastic doors. (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of the building of the apartment building in ul. Ditches 38 in Hostouni, in order to reduce the energy performance of the object. To reduce the energy intensity of the building is designed to insulate the perimeter walls, including the plinth. In addition, a complete reconstruction of loggias and their insulation will be carried out and the original windows and balcony doors will be replaced with new plastic doors. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:51, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation of housing House ul. Ditches st.38 in Hoastni
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    869,620.77 Czech koruna
    0 references
    34,784.83 Euro
    1 October 2020
    0 references
    2,898,735.92 Czech koruna
    0 references
    115,949.44 Euro
    1 October 2020
    0 references
    30.0 percent
    0 references
    2 March 2018
    0 references
    3 December 2018
    0 references
    31 August 2019
    0 references
    Společenství vlastníků Hostouň, Příkopy 38
    0 references
    0 references

    49°33'54.0"N, 12°45'13.0"E
    0 references
    34525
    0 references
    Předmětem projektu jsou stavební úpravy objektu bytového domu v ul. Příkopy 38 v Hostouni, za účelem snížení energetické náročnosti objektu. Pro snížení energetické náročnostibudovy je navrženo zateplení obvodových stěn včetně soklu. Dále bude provedena celková rekonstrukce lodžií a jejich zateplení a bude provedena výměna původních oken a balkonových dveří za nová plastová. (Czech)
    0 references
    The object of the project is the construction of the building of the apartment building in ul. Ditches 38 in Hostouni, in order to reduce the energy performance of the object. To reduce the energy intensity of the building is designed to insulate the perimeter walls, including the plinth. In addition, a complete reconstruction of loggias and their insulation will be carried out and the original windows and balcony doors will be replaced with new plastic doors. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/17_097/0008551
    0 references