Modernisation of the II/315 road — delay — delays (Q74875): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project implements the modernisation of the II/315 road in a stretch passing through a large part of the municipality of Hrádek on an overall length of 1 705 m. the section is part of the Priority reg. Network of the Pardub Region under IROP (a section from intersection with II/317 to the junction with I/14). The full reconstruction of the road (incl. exchange of road construction, upgrading of the bridge, construction of a new rain sewer)...) |
(Created claim: summary (P836): As part of the project, the modernisation of Road II/315 is carried out in a section passing through the municipality of Hrádek for a large part of the municipality with a total length of 1705 m. The tracked section is part of the Prioritní Reg. Reg. of the Pardub. Region according to the IROP (section from the junction with II/317 to the intersection with I/14). Complete reconstruction of the road (including replacement of the road structure, m...) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, the modernisation of Road II/315 is carried out in a section passing through the municipality of Hrádek for a large part of the municipality with a total length of 1705 m. The tracked section is part of the Prioritní Reg. Reg. of the Pardub. Region according to the IROP (section from the junction with II/317 to the intersection with I/14). Complete reconstruction of the road (including replacement of the road structure, modernisation of the bridge, construction of a new rain sewer) will contribute to improving the transport infrastructure in Pardubice Region, including the connection of the region to the TEN-T network. (English) | |||||||||||||||
Property / summary: As part of the project, the modernisation of Road II/315 is carried out in a section passing through the municipality of Hrádek for a large part of the municipality with a total length of 1705 m. The tracked section is part of the Prioritní Reg. Reg. of the Pardub. Region according to the IROP (section from the junction with II/317 to the intersection with I/14). Complete reconstruction of the road (including replacement of the road structure, modernisation of the bridge, construction of a new rain sewer) will contribute to improving the transport infrastructure in Pardubice Region, including the connection of the region to the TEN-T network. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, the modernisation of Road II/315 is carried out in a section passing through the municipality of Hrádek for a large part of the municipality with a total length of 1705 m. The tracked section is part of the Prioritní Reg. Reg. of the Pardub. Region according to the IROP (section from the junction with II/317 to the intersection with I/14). Complete reconstruction of the road (including replacement of the road structure, modernisation of the bridge, construction of a new rain sewer) will contribute to improving the transport infrastructure in Pardubice Region, including the connection of the region to the TEN-T network. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:25, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the II/315 road — delay — delays |
Project in Czech Republic financed by DG Regio |
Statements
62,985,202.35 Czech koruna
0 references
74,100,238.07 Czech koruna
0 references
85.0 percent
0 references
3 June 2014
0 references
31 August 2018
0 references
31 August 2018
0 references
Pardubický kraj
0 references
53002
0 references
V rámci projektu je realizována modernizace silnice II/315 v úseku procházejícím z velké části intravilánem obce Hrádek o celkové délce 1 705 m. Sledovaný úsek je součástí Prioritní reg. silniční sítě Pardub. kraje dle IROP (úsek od křižovatky s II/317 ke křižovatce s I/14). Kompletní rekonstrukce silnice (vč. výměny konstrukce vozovky, modernizace mostu, výstavby nové dešťové kanalizace) přispěje ke zkvalitnění dopravní infrastruktury v Pardubickém kraji, včetně napojení regionu na síť TEN-T. (Czech)
0 references
As part of the project, the modernisation of Road II/315 is carried out in a section passing through the municipality of Hrádek for a large part of the municipality with a total length of 1705 m. The tracked section is part of the Prioritní Reg. Reg. of the Pardub. Region according to the IROP (section from the junction with II/317 to the intersection with I/14). Complete reconstruction of the road (including replacement of the road structure, modernisation of the bridge, construction of a new rain sewer) will contribute to improving the transport infrastructure in Pardubice Region, including the connection of the region to the TEN-T network. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.42/0.0/0.0/15_002/0000995
0 references