BD Prd Hájem 304, Králův Důr (Q75343): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The content of the project is a free-standing house st. 573/1, 573/2 in the municipality of Králův Důr, province of Beroun. The project follows the insulation of the label walls and the roof by completing the thermal insulation of the entire building envelope. It is ready to reduce energy in line with the IROP requirements. The aim of the project is to reduce expenditure for heating the population of a building in convergence with the effect o...) |
(Created claim: summary (P836): The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the...) |
||||||||||||||
Property / summary | |||||||||||||||
The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English) | |||||||||||||||
Property / summary: The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:17, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | BD Prd Hájem 304, Králův Důr |
Project in Czech Republic financed by DG Regio |
Statements
769,414.26 Czech koruna
0 references
2,564,714.22 Czech koruna
0 references
30.0 percent
0 references
2 January 2018
0 references
30 November 2017
0 references
Společenství vlastníků jednotek Pod Hájem 304, Králův Dvůr
0 references
26701
0 references
Obsahem projektu je samostatně stojící dům st. 573/1, 573/2 v obci Králův Dvůr, okres Beroun. Projekt navazuje na dílčí zateplení štítových stěn a střechy dokončením tepelné izolace celé obálky budovy. Je připraven pro snížení energií podle požadavků IROP. Cílem projektu je snížit výdaje za vytápění obyvatel domu v konvergenci s účinkemsnížení emisí v ČR. Návrh k dodržení kritérií pro přidělení dotace jsou uvedeny v projektové dokumentaci. Předpokladem pro realizaci je obdržení dotace. (Czech)
0 references
The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the Czech Republic. The proposal for compliance with the criteria for awarding the subsidy is set out in the project documentation. The prerequisite for implementation is the receipt of the subsidy. (English)
23 October 2020
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0001888
0 references