Construction finishes BD Č.p. 662, Bílovec (Q76081): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project deals with: the insulation of the perimeter retractable of the open-floor sun containment station at the ceiling above 2NP-exchange of windows and door interchange of the internal distribution of the domestic hot water distribution system, the exchange of a source for the exchange of a source for the replacement of a heat exchange source with building and preparatory work, building on the construction of leopard works, and the cons...)
(‎Created claim: summary (P836): The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work., translated_summary)
Property / summary
 
The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work. (English)
Property / summary: The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work. (English) / rank
 
Normal rank
Property / summary: The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:15, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction finishes BD Č.p. 662, Bílovec
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,778,224.14 Czech koruna
    0 references
    71,128.97 Euro
    1 October 2020
    0 references
    4,445,560.35 Czech koruna
    0 references
    177,822.41 Euro
    1 October 2020
    0 references
    40 percent
    0 references
    1 May 2017
    0 references
    3 October 2018
    0 references
    5 October 2018
    0 references
    xxx
    0 references
    0 references

    49°47'21.8"N, 18°6'57.2"E
    0 references
    74283
    0 references
    Projekt řeší:-zateplení obvodového pláště-zateplení soklu-zateplení podlahy na zemině-zateplení stropu nad 2NP-výměna oken a dveří-výměna vnitřního rozvodu teplé vody-výměna zdroje vytápění-výměna rozvodu vytápění-výměna zdroje TUV-instalace podlahového vytápění-stavební a přípravné práce-klempířské práce-výstavba lešení vč.záchytných sítí-bourací stavební práce (Czech)
    0 references
    The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0007022
    0 references